Response synthesis and audit

Agency responses to Mono County Cybersecurity Preparedness

Mono County Information Technology Director: Partly disputes the payment-card finding and agrees with the other findings. Describes planned backups, equipment replacement, testing, staffing requests, and quarterly reporting; several actions depend on budget allocations. Mono County Board of Supervisors: Partly disputes the payment-card finding and agrees with the other findings. Describes planned backups, equipment replacement, testing, staffing requests, and quarterly reporting; several actions depend on budget allocations.

Response by Mono County Information Technology Director; Mono County Board of Supervisors

16

Addressed

10

Partially addressed

0

Not addressed

0

Unclear

County's stated disposition

These categories reflect the County's response to each recommendation, separate from this audit's assessment.

0

Implemented

14

Will be implemented

0

Requires further analysis

0

Will not be implemented

0

Unclear

How to read this audit

This review assesses how the response engages the cited finding or recommendation, not whether the respondent’s factual or legal claims are correct. Implementation descriptions are agency claims or commitments, not independently verified completion. Citations use PDF page numbers, including cover pages. This packet concatenates the original PDFs without changing their pages. cybersecurity-it-response.pdf: packet pages 1–9; cybersecurity-board-response.pdf: packet pages 10–17. Each audit names its respondent and response date. Original-source notes: The final recommendation’s response subheading says R7, but the surrounding R8 text, implementation heading, and quarterly-reporting subject clearly identify R8. The cover letter has a stale 2020–2021 subject line; its body and Attachment A identify the current cybersecurity investigation. The final recommendation’s response subheading says R7, but the surrounding R8 text, implementation heading, and quarterly-reporting subject clearly identify R8.

Commitments

Actions stated in the response

These are commitments extracted from the County's response. They describe what the response says will happen; they do not verify that implementation occurred.

14

Extracted commitments

11

Definite or bounded timing

3

Conditional timing

0

No timeframe

R2-IT · Conditional timing

Train IT staff and coordinate the annual PCI assessment with Finance and payment-processing departments.

After Board direction on the timeline

R3-IT · Bounded timeframe

Determine the correct PCI self-assessment questionnaire with Finance and other responsible departments.

Before the close of fiscal year 2025–2026

R4-IT · Bounded timeframe

Research and plan immutable backups and include resource needs in budget requests.

Fiscal year 2025–2026 budget process

R5-IT · Bounded timeframe

Update replacement procedures and cost monitoring for unsupported equipment.

By the close of fiscal year 2025–2026

R6-IT · Conditional timing

Explore penetration-testing vendors and establish a periodic testing schedule.

Fiscal year 2025–2026, subject to resource allocation and Board direction

R7-IT · Bounded timeframe

Assess IT staffing needs and include required personnel requests in fiscal year 2026–2027 proposals.

Fiscal year 2026–2027 budget proposals

R8-IT · Bounded timeframe

Provide quarterly training-compliance reports to the Board and department heads.

First quarter of fiscal year 2025–2026, then quarterly

R2-BOS · Bounded timeframe

Train IT staff and coordinate the annual PCI assessment with Finance and payment-processing departments.

Fiscal year 2025–2026

R3-BOS · Bounded timeframe

Determine the correct PCI self-assessment questionnaire with Finance and other responsible departments.

Before the close of fiscal year 2025–2026

R4-BOS · Bounded timeframe

Research and plan immutable backups and include resource needs in budget requests.

Fiscal year 2025–2026 budget process

R5-BOS · Bounded timeframe

Update replacement procedures and cost monitoring for unsupported equipment.

By the close of fiscal year 2025–2026

R6-BOS · Conditional timing

Explore penetration-testing vendors and establish a periodic testing schedule.

Fiscal year 2025–2026, subject to resource allocation and Board direction

R7-BOS · Bounded timeframe

Assess IT staffing needs and include required personnel requests in fiscal year 2026–2027 proposals.

Fiscal year 2026–2027 budget proposals

R8-BOS · Bounded timeframe

Provide quarterly training-compliance reports to the Board and department heads.

First quarter of fiscal year 2025–2026, then quarterly

Item-by-item review

Findings and recommendations

Assessments describe whether the response engages each cited item. Finding scores separately describe statutory-elements completeness under California Penal Code § 933.05(a) and public usefulness. They do not independently verify the response or constitute a legal conclusion.

Showing 26 of 26 items

finding · F2-IT

IT participation in payment-card assessment

Audit: Partially addressed

Response says

Partly agrees and partly disagrees, explaining that third-party processors and Finance manage payments while IT should assist with assessment and security review.

Audit analysis

The response’s engagement is evaluated independently of whether the County’s security measures are effective.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

7/10

3/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
1/2

4/6

Public usefulness

Coverage
1/2
Reason specificity
2/2
Support traceability
1/2

The partial position is explicit and the departmental explanation is concrete. It does not clearly identify whether the alleged attestation errors are accepted or disputed; support is operational assertion rather than an identified record.

Scoring confidence: high

finding · F3-IT

Immutable backups

Audit: Addressed

Response says

Agrees that missing immutable backups increase disruption risk and proposes researching practical options with departments.

Audit analysis

The response’s engagement is evaluated independently of whether the County’s security measures are effective.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

8/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

4/6

Public usefulness

Coverage
2/2
Reason specificity
1/2
Support traceability
1/2

Explicit agreement covers the finding; the explanation identifies reliable backups and departmental planning but supplies general reasoning and no identified supporting record.

Scoring confidence: high

finding · F4-IT

Unsupported computing equipment

Audit: Addressed

Response says

Agrees that end-of-life devices remain and describes funding and staffing limits within the Technology Refresh/Internal Service Fund established in 2014.

Audit analysis

The response’s engagement is evaluated independently of whether the County’s security measures are effective.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Explicit agreement covers the risk and obsolete equipment. The explanation names the 2014 internal service fund, how departments fund it, and specific replacement constraints.

Scoring confidence: high

finding · F5-IT

Periodic external security testing

Audit: Addressed

Response says

Agrees with the testing gap, describes existing 24/7 monitoring, and proposes additional testing and vendor relationships.

Audit analysis

The response’s engagement is evaluated independently of whether the County’s security measures are effective.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

9/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

5/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
1/2

Explicit agreement covers the testing gap and risk. Existing monitoring and pursued services provide specific context, but no identified test record or funding document is cited.

Scoring confidence: high

finding · F6-IT

Cybersecurity staffing

Audit: Addressed

Response says

Agrees that staffing is insufficient, reports a Chief Information Security Officer hired in March 2025, and plans work with Human Resources on a Cyber Security Analyst position. Also anticipates losses linked to the County’s remote-work change.

Audit analysis

The response’s engagement is evaluated independently of whether the County’s security measures are effective.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Explicit agreement addresses the staffing constraint and delayed work. The March 2025 hire is a dated, checkable event, and the response identifies the analyst recruitment steps.

Scoring confidence: high

finding · F7-IT

Visibility of training compliance

Audit: Addressed

Response says

Agrees that training results have not been brought to the Board and proposes quarterly reporting to supervisors and department heads, with sensitive vulnerabilities discussed separately.

Audit analysis

The response’s engagement is evaluated independently of whether the County’s security measures are effective.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Explicit agreement covers training and visibility. The response explains the reporting gap and names the Brown Act closed-session amendment as its basis for handling sensitive details.

Scoring confidence: high

recommendation · R2-IT

Cooperative PCI assessment process

County: Will be implementedAudit: Partially addressed

Response says

Plans staff training and collaboration among IT, Finance, and payment-processing departments. Will seek Board direction on the completion timeline.

Audit analysis

The proposed cooperation engages the recommendation, but the response does not clearly commit to documenting the process or meeting the August 1, 2025 deadline.

Extracted commitments

Train IT staff and coordinate the annual PCI assessment with Finance and payment-processing departments.

Responsible party
Mono County Information Technology Director
Timing
After Board direction on the timeline · Conditional timing

recommendation · R3-IT

Correct PCI questionnaire

County: Will be implementedAudit: Addressed

Response says

Plans to identify the correct SAQ with Finance and other payment-processing departments before the close of fiscal year 2025–2026.

Audit analysis

Identifies the requested task and partners; its completion window is later than the jury’s August 1, 2025 deadline.

Extracted commitments

Determine the correct PCI self-assessment questionnaire with Finance and other responsible departments.

Responsible party
Mono County Information Technology Director
Timing
Before the close of fiscal year 2025–2026 · Bounded timeframe

recommendation · R4-IT

Immutable-backup plan

County: Will be implementedAudit: Partially addressed

Response says

Agrees and proposes research, departmental consultation, implementation procedures, and fiscal year 2025–2026 resource requests.

Audit analysis

Describes how a plan would be developed, but the budget-request window is not a firm plan-completion date and does not resolve the September 1 deadline.

Extracted commitments

Research and plan immutable backups and include resource needs in budget requests.

Responsible party
Mono County Information Technology Director
Timing
Fiscal year 2025–2026 budget process · Bounded timeframe

recommendation · R5-IT

Sustainable equipment replacement

County: Will be implementedAudit: Addressed

Response says

Agrees to update replacement procedures, monitor costs, and seek personnel resources by the close of fiscal year 2025–2026.

Audit analysis

Addresses a continuing replacement process and resource constraints, while replacing the jury’s earlier deadline with a fiscal-year window.

Extracted commitments

Update replacement procedures and cost monitoring for unsupported equipment.

Responsible party
Mono County Information Technology Director
Timing
By the close of fiscal year 2025–2026 · Bounded timeframe

recommendation · R6-IT

Recurring penetration testing

County: Will be implementedAudit: Partially addressed

Response says

Agrees to explore testing vendors and establish a periodic schedule, with implementation tied to fiscal year 2025–2026 resources.

Audit analysis

Describes the requested recurring-testing process; funding and vendor selection remain conditions, and the September 1 deadline is not adopted.

Extracted commitments

Explore penetration-testing vendors and establish a periodic testing schedule.

Responsible party
Mono County Information Technology Director
Timing
Fiscal year 2025–2026, subject to resource allocation and Board direction · Conditional timing

recommendation · R7-IT

Staffing assessment and budget requests

County: Will be implementedAudit: Partially addressed

Response says

Agrees to assess staffing and develop a Cyber Security Analyst allocation and job description; personnel requests are to be included in fiscal year 2026–2027 proposals. Says the full assessment can occur after September 11, 2025.

Audit analysis

Engages the staffing assessment and budget submission, but the response points to the following fiscal-year proposal rather than clearly committing to the jury’s October 1 deadline.

Extracted commitments

Assess IT staffing needs and include required personnel requests in fiscal year 2026–2027 proposals.

Responsible party
Mono County Information Technology Director
Timing
Fiscal year 2026–2027 budget proposals · Bounded timeframe

recommendation · R8-IT

Quarterly training reports

County: Will be implementedAudit: Addressed

Response says

Agrees to quarterly reports to the Board and department heads, beginning in the first quarter of fiscal year 2025–2026.

Audit analysis

Specifies the reporting recipients, frequency, and initial reporting window. The R7 response subheading is a numbering error within the R8 entry.

Extracted commitments

Provide quarterly training-compliance reports to the Board and department heads.

Responsible party
Mono County Information Technology Director
Timing
First quarter of fiscal year 2025–2026, then quarterly · Bounded timeframe

finding · F2-BOS

IT participation in payment-card assessment

Audit: Partially addressed

Response says

Partly agrees and partly disagrees, explaining that third-party processors and Finance manage payments while IT should assist with assessment and security review.

Audit analysis

The response’s engagement is evaluated independently of whether the County’s security measures are effective.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

7/10

3/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
1/2

4/6

Public usefulness

Coverage
1/2
Reason specificity
2/2
Support traceability
1/2

The partial position is explicit and the departmental explanation is concrete. It does not clearly identify whether the alleged attestation errors are accepted or disputed; support is operational assertion rather than an identified record.

Scoring confidence: high

finding · F3-BOS

Immutable backups

Audit: Addressed

Response says

Agrees that missing immutable backups increase disruption risk and proposes researching practical options with departments.

Audit analysis

The response’s engagement is evaluated independently of whether the County’s security measures are effective.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

8/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

4/6

Public usefulness

Coverage
2/2
Reason specificity
1/2
Support traceability
1/2

Explicit agreement covers the finding; the explanation identifies reliable backups and departmental planning but supplies general reasoning and no identified supporting record.

Scoring confidence: high

finding · F4-BOS

Unsupported computing equipment

Audit: Addressed

Response says

Agrees that end-of-life devices remain and describes funding and staffing limits within the Technology Refresh/Internal Service Fund established in 2014.

Audit analysis

The response’s engagement is evaluated independently of whether the County’s security measures are effective.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Explicit agreement covers the risk and obsolete equipment. The explanation names the 2014 internal service fund, how departments fund it, and specific replacement constraints.

Scoring confidence: high

finding · F5-BOS

Periodic external security testing

Audit: Addressed

Response says

Agrees with the testing gap, describes existing 24/7 monitoring, and proposes additional testing and vendor relationships.

Audit analysis

The response’s engagement is evaluated independently of whether the County’s security measures are effective.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

9/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

5/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
1/2

Explicit agreement covers the testing gap and risk. Existing monitoring and pursued services provide specific context, but no identified test record or funding document is cited.

Scoring confidence: high

finding · F6-BOS

Cybersecurity staffing

Audit: Addressed

Response says

Agrees that staffing is insufficient, reports a Chief Information Security Officer hired in March 2025, and plans work with Human Resources on a Cyber Security Analyst position.

Audit analysis

The response’s engagement is evaluated independently of whether the County’s security measures are effective.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Explicit agreement addresses the staffing constraint and delayed work. The March 2025 hire is a dated, checkable event, and the response identifies the analyst recruitment steps.

Scoring confidence: high

finding · F7-BOS

Visibility of training compliance

Audit: Addressed

Response says

Agrees that training results have not been brought to the Board and proposes quarterly reporting to supervisors and department heads, with sensitive vulnerabilities discussed separately.

Audit analysis

The response’s engagement is evaluated independently of whether the County’s security measures are effective.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Explicit agreement covers training and visibility. The response explains the reporting gap and names the Brown Act closed-session amendment as its basis for handling sensitive details.

Scoring confidence: high

recommendation · R2-BOS

Cooperative PCI assessment process

County: Will be implementedAudit: Partially addressed

Response says

Plans staff training and collaboration among IT, Finance, and payment-processing departments. Expects this work in fiscal year 2025–2026.

Audit analysis

The proposed cooperation engages the recommendation, but the response does not clearly commit to documenting the process or meeting the August 1, 2025 deadline.

Extracted commitments

Train IT staff and coordinate the annual PCI assessment with Finance and payment-processing departments.

Responsible party
Mono County Board of Supervisors
Timing
Fiscal year 2025–2026 · Bounded timeframe

recommendation · R3-BOS

Correct PCI questionnaire

County: Will be implementedAudit: Addressed

Response says

Plans to identify the correct SAQ with Finance and other payment-processing departments before the close of fiscal year 2025–2026.

Audit analysis

Identifies the requested task and partners; its completion window is later than the jury’s August 1, 2025 deadline.

Extracted commitments

Determine the correct PCI self-assessment questionnaire with Finance and other responsible departments.

Responsible party
Mono County Board of Supervisors
Timing
Before the close of fiscal year 2025–2026 · Bounded timeframe

recommendation · R4-BOS

Immutable-backup plan

County: Will be implementedAudit: Partially addressed

Response says

Agrees and proposes research, departmental consultation, implementation procedures, and fiscal year 2025–2026 resource requests.

Audit analysis

Describes how a plan would be developed, but the budget-request window is not a firm plan-completion date and does not resolve the September 1 deadline.

Extracted commitments

Research and plan immutable backups and include resource needs in budget requests.

Responsible party
Mono County Board of Supervisors
Timing
Fiscal year 2025–2026 budget process · Bounded timeframe

recommendation · R5-BOS

Sustainable equipment replacement

County: Will be implementedAudit: Addressed

Response says

Agrees to update replacement procedures, monitor costs, and seek personnel resources by the close of fiscal year 2025–2026.

Audit analysis

Addresses a continuing replacement process and resource constraints, while replacing the jury’s earlier deadline with a fiscal-year window.

Extracted commitments

Update replacement procedures and cost monitoring for unsupported equipment.

Responsible party
Mono County Board of Supervisors
Timing
By the close of fiscal year 2025–2026 · Bounded timeframe

recommendation · R6-BOS

Recurring penetration testing

County: Will be implementedAudit: Partially addressed

Response says

Agrees to explore testing vendors and establish a periodic schedule, with implementation tied to fiscal year 2025–2026 resources.

Audit analysis

Describes the requested recurring-testing process; funding and vendor selection remain conditions, and the September 1 deadline is not adopted.

Extracted commitments

Explore penetration-testing vendors and establish a periodic testing schedule.

Responsible party
Mono County Board of Supervisors
Timing
Fiscal year 2025–2026, subject to resource allocation and Board direction · Conditional timing

recommendation · R7-BOS

Staffing assessment and budget requests

County: Will be implementedAudit: Partially addressed

Response says

Agrees to assess staffing and develop a Cyber Security Analyst allocation and job description; personnel requests are to be included in fiscal year 2026–2027 proposals.

Audit analysis

Engages the staffing assessment and budget submission, but the response points to the following fiscal-year proposal rather than clearly committing to the jury’s October 1 deadline.

Extracted commitments

Assess IT staffing needs and include required personnel requests in fiscal year 2026–2027 proposals.

Responsible party
Mono County Board of Supervisors
Timing
Fiscal year 2026–2027 budget proposals · Bounded timeframe

recommendation · R8-BOS

Quarterly training reports

County: Will be implementedAudit: Addressed

Response says

Agrees to quarterly reports to the Board and department heads, beginning in the first quarter of fiscal year 2025–2026.

Audit analysis

Specifies the reporting recipients, frequency, and initial reporting window. The R7 response subheading is a numbering error within the R8 entry.

Extracted commitments

Provide quarterly training-compliance reports to the Board and department heads.

Responsible party
Mono County Board of Supervisors
Timing
First quarter of fiscal year 2025–2026, then quarterly · Bounded timeframe