Response says
Partially disagrees: periodic dredging is needed, but3–5years is not a regulatory requirement and local conditions determine need.
What should residents consider about Finding MARTINEZ2609-F7: F7: Dredging of the marina every 3 to 5 years is required to provide enough waterway depth for boats to access docks., and the County’s response?
Audit context
Response says
Partially disagrees: periodic dredging is needed, but3–5years is not a regulatory requirement and local conditions determine need.
Audit analysis
Identifies accepted maintenance need and disputed fixed interval with site-specific reasons; cites no regulation or engineering record for interval. Formal finding concerns waterway depth, not expressly a regulatory mandate.
Finding-response score
Document completeness and usefulness—not factual verification or a legal conclusion.
4/4
Statutory elements
5/6
Public usefulness
Identifies accepted maintenance need and disputed fixed interval with site-specific reasons; cites no regulation or engineering record for interval. Formal finding concerns waterway depth, not expressly a regulatory mandate.
Scoring confidence: high