Recommendation R5

Recommendation R5

By September 30, 2026, OCWD and all Orange County water retailers should enhance coordinated public education efforts to reassure their customers about drinking water safety. [F6, F8]

Jury report: PFAS and Public Awareness: A Closer Look at Orange County Drinking Water · PDF page 37

Permanent link

Official responses

Golden State Water Company

Agency plans to implement

Will add project design/construction status and OCWD PFAS link; collaboration whenever possible.

Read official response · PDF page 4

Will add project design/construction status and OCWD PFAS link; collaboration whenever possible. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 4. Engagement is not independent factual, legal or implementation verification.

  • Respondent describes: Add website design/construction project status and OCWD PFAS link. Source status: future; not independently verified. Owner: Golden State Water Company. Timing: 2026-09-30.

This review evaluates the response document. Implementation claims have not been independently verified.

City of Westminster

Agency position unclear

Will coordinate with OCWD/regional partners; points customers to OCWD and participates in community outreach.

Read official response · PDF page 3

Will coordinate with OCWD/regional partners; points customers to OCWD and participates in community outreach. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

  • Respondent reports: Coordinate public PFAS education with OCWD/regional partners and provide educational material at community events. Source status: claimed-ongoing; not independently verified. Owner: City of Westminster. Timing: Not specified.

This review evaluates the response document. Implementation claims have not been independently verified.

City of La Palma

Agency says implemented

Website/CCR information will continue; no discrete new enhancement described.

Read official response · PDF page 2

Website/CCR information will continue; no discrete new enhancement described. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

This review evaluates the response document. Implementation claims have not been independently verified.

South Coast Water District

Agency plans to implement

Dedicated communication to full customer list, website information, MWDOC coordination for relevant imported-supply messaging by stated date. Doheny PFAS-relevant messaging where appropriate.

Read official response · PDF page 4

Dedicated communication to full customer list, website information, MWDOC coordination for relevant imported-supply messaging by stated date. Doheny PFAS-relevant messaging where appropriate. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF pages 4–5. Engagement is not independent factual, legal or implementation verification.

  • Respondent describes: Send dedicated PFAS communication to full customer list; add plain-language water-quality webpage with source/treatment/regulatory resources; coordinate relevant imported-water messages with MWDOC. Conditions/limits: No real-time/continuously updated online monitoring data; specific results through district staff. Source status: future; not independently verified. Owner: South Coast Water District. Timing: 2026-09-30.

This review evaluates the response document. Implementation claims have not been independently verified.

Serrano Water District

Agency says implemented

Coordination with OCWD and continued website educational information/resources/updates.

Read official response · PDF page 2

Coordination with OCWD and continued website educational information/resources/updates. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

  • Respondent reports: Continue OCWD-coordinated website PFAS information/resources/updates. Source status: claimed-ongoing; not independently verified. Owner: Serrano Water District. Timing: Not specified.

This review evaluates the response document. Implementation claims have not been independently verified.

City of Huntington Beach

Agency position unclear

Website/CCR/OCWD references plus Surf City Nights and Citizens Academy outreach.

Read official response · PDF page 4

Website/CCR/OCWD references plus Surf City Nights and Citizens Academy outreach. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 4. Engagement is not independent factual, legal or implementation verification.

  • Respondent reports: Continue website/CCR information and OCWD references; Surf City Nights/Citizens Academy outreach. Source status: claimed-ongoing; not independently verified. Owner: City of Huntington Beach. Timing: Not specified.

This review evaluates the response document. Implementation claims have not been independently verified.

Mesa Water District

Agency position unclear

General continued coordinated outreach, no discrete new action or timeframe.

Read official response · PDF page 3

General continued coordinated outreach, no discrete new action or timeframe. Explicit assent/general principle alone does not supply an implementation disposition or sufficient action detail. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

This review evaluates the response document. Implementation claims have not been independently verified.

City of Orange

Agency says implemented

Continued social media, tours, community events and student engagement; no completion date supplied.

Read official response · PDF page 3

Continued social media, tours, community events and student engagement; no completion date supplied. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

  • Respondent reports: Continue social media, tours, community events and student engagement on drinking-water safety. Source status: claimed-ongoing; not independently verified. Owner: City of Orange. Timing: Not specified.

This review evaluates the response document. Implementation claims have not been independently verified.

City of Buena Park

Agency plans to implement

Will explore additional marketing methods such as website/bill inserts with OCWD; September 20 not report September 30.

Read official response · PDF page 3

Will explore additional marketing methods such as website/bill inserts with OCWD; September 20 not report September 30. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

  • Respondent describes: Explore additional marketing methods such as website and water-bill inserts with OCWD. Source status: future; not independently verified. Owner: City of Buena Park. Timing: 2026-09-20.

This review evaluates the response document. Implementation claims have not been independently verified.

Orange County Water District

Agency position unclear

Website and monthly newsletter actions continuing; no new dated enhancement specified.

Read official response · PDF page 5

Website and monthly newsletter actions continuing; no new dated enhancement specified. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 5. Engagement is not independent factual, legal or implementation verification.

This review evaluates the response document. Implementation claims have not been independently verified.

Emerald Bay Service District

Agency plans to implement

Coordinate with LBCWD and OCWD where applicable; publish customer communications and website information/links before deadline.

Read official response · PDF page 3

Coordinate with LBCWD and OCWD where applicable; publish customer communications and website information/links before deadline. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

  • Respondent describes: Publish customer-facing PFAS/safety communications, website updates/links with LBCWD and OCWD where applicable. Source status: future; not independently verified. Owner: Emerald Bay Service District. Timing: 2026-09-30.

This review evaluates the response document. Implementation claims have not been independently verified.

Trabuco Canyon Water District

Agency says implemented

Added CCR PFAS information with MWDOC agencies; urges focus on non-drinking-water pathways and balanced non-alarmist messages.

Read official response · PDF page 2

Added CCR PFAS information with MWDOC agencies; urges focus on non-drinking-water pathways and balanced non-alarmist messages. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

This review evaluates the response document. Implementation claims have not been independently verified.

City of Fountain Valley

Agency position unclear

Website graphics, simplified data and OCWD/DDW/EPA links planned by September 30, 2026; countywide campaigns/joint outreach continuing.

Read official response · PDF page 3

Website graphics, simplified data and OCWD/DDW/EPA links planned by September 30, 2026; countywide campaigns/joint outreach continuing. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

  • Respondent describes: Update website with graphics, simplified data and OCWD/DDW/EPA links; continue joint campaigns/events. Source status: future; not independently verified. Owner: City of Fountain Valley. Timing: 2026-09-30.

This review evaluates the response document. Implementation claims have not been independently verified.

Santa Margarita Water District

Agency says implemented

Current outreach/CCR information and continued emerging-constituent education, no discrete expansion.

Read official response · PDF page 3

Current outreach/CCR information and continued emerging-constituent education, no discrete expansion. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

This review evaluates the response document. Implementation claims have not been independently verified.

Moulton Niguel Water District

Agency declines implementation

Declines expansion, enumerates existing online/print/electronic newsletters, bills/envelope message, speakers bureau, email/web/social media; continue coordination as appropriate.

Read official response · PDF page 3

Declines expansion, enumerates existing online/print/electronic newsletters, bills/envelope message, speakers bureau, email/web/social media; continue coordination as appropriate. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF pages 3–4. Engagement is not independent factual, legal or implementation verification.

  • Respondent reports: Maintain listed localized CCR/newsletter/bill/speakers/email/web/social-media education rather than expand it; coordinate as appropriate. Conditions/limits: Expansion explicitly will not be implemented; existing/planned efforts considered sufficient. Source status: claimed-ongoing-with-refusal; not independently verified. Owner: Moulton Niguel Water District. Timing: Not specified.

This review evaluates the response document. Implementation claims have not been independently verified.

Yorba Linda Water District

Agency position unclear

Existing treatment tours, annual open house, recurring outreach/publications; continued education.

Read official response · PDF page 3

Existing treatment tours, annual open house, recurring outreach/publications; continued education. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

  • Respondent reports: Continue treatment tours, annual open house, recurring events and district publications. Source status: claimed-ongoing; not independently verified. Owner: Yorba Linda Water District. Timing: Not specified.

This review evaluates the response document. Implementation claims have not been independently verified.

City of Anaheim

Agency says implemented

Existing F8 programs; continue in-person events, tours, student engagement, information and social media.

Read official response · PDF page 4

Existing F8 programs; continue in-person events, tours, student engagement, information and social media. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 4. Engagement is not independent factual, legal or implementation verification.

  • Respondent reports: Continue described community events/tours/student engagement/public information/social media. Source status: claimed-ongoing; not independently verified. Owner: City of Anaheim. Timing: Not specified.

This review evaluates the response document. Implementation claims have not been independently verified.

City of Garden Grove

Agency says implemented

CCR, city website/social media and direct inquiry responses continuing.

Read official response · PDF page 2

CCR, city website/social media and direct inquiry responses continuing. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF pages 2–3. Engagement is not independent factual, legal or implementation verification.

  • Respondent reports: Continue CCR, website, social media and responses to inquiries with OCWD. Source status: claimed-ongoing; not independently verified. Owner: City of Garden Grove. Timing: Not specified.

This review evaluates the response document. Implementation claims have not been independently verified.

City of Seal Beach

Agency position unclear

Future coordination on collectively agreeable date, existing channels and avoidance of duplication/resource impacts; not September 30 promise.

Read official response · PDF page 3

Future coordination on collectively agreeable date, existing channels and avoidance of duplication/resource impacts; not September 30 promise. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

  • Respondent describes: Coordinate future public education using existing website/report/customer-service channels. Conditions/limits: Collectively agreeable date not specified; avoid duplication and undue resource impacts. Source status: future; not independently verified. Owner: City of Seal Beach. Timing: Not specified.

This review evaluates the response document. Implementation claims have not been independently verified.

City of Tustin

Agency says implemented

City/OCWD continuing public website information/resources/updates.

Read official response · PDF page 2

City/OCWD continuing public website information/resources/updates. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF pages 2–3. Engagement is not independent factual, legal or implementation verification.

  • Respondent reports: Continue OCWD-coordinated website PFAS information/resources/updates. Source status: claimed-ongoing; not independently verified. Owner: City of Tustin. Timing: Not specified.

This review evaluates the response document. Implementation claims have not been independently verified.

City of San Clemente

Agency plans to implement

Dated commitment to enhanced coordination; no discrete channel or deliverable specified.

Read official response · PDF page 3

Dated commitment to enhanced coordination; no discrete channel or deliverable specified. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

  • Respondent describes: Enhance coordinated public education. Conditions/limits: No discrete method specified. Source status: future; not independently verified. Owner: City of San Clemente. Timing: 2026-09-30.

This review evaluates the response document. Implementation claims have not been independently verified.

City of La Habra

Agency says implemented

Existing La Habra Life newsletter, Life in La Habra magazine and community booths; no specific PFAS coordination described.

Read official response · PDF page 3

Existing La Habra Life newsletter, Life in La Habra magazine and community booths; no specific PFAS coordination described. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

  • Respondent reports: Maintain La Habra Life newsletter, Life in La Habra magazine and community booths. Conditions/limits: No specific PFAS coordination detailed. Source status: claimed-completed; not independently verified. Owner: City of La Habra. Timing: Not specified.

This review evaluates the response document. Implementation claims have not been independently verified.

City of Brea

Agency declines implementation

Same imported-only/no-well/compliance rationale; no enhanced coordination commitment.

Read official response · PDF page 2

Same imported-only/no-well/compliance rationale; no enhanced coordination commitment. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

This review evaluates the response document. Implementation claims have not been independently verified.

Laguna Beach County Water District

Agency plans to implement

Continue OCWD/regional partner coordination for PFAS/water-quality education.

Read official response · PDF page 2

Continue OCWD/regional partner coordination for PFAS/water-quality education. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

  • Respondent describes: Coordinate OCWD/regional education implementation. Source status: future; not independently verified. Owner: Laguna Beach County Water District. Timing: 2026-09-30.

This review evaluates the response document. Implementation claims have not been independently verified.

City of Newport Beach

Agency says implemented

Continue educational website information and OCWD links.

Read official response · PDF page 4

Continue educational website information and OCWD links. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 4. Engagement is not independent factual, legal or implementation verification.

  • Respondent reports: Continue website PFAS education and OCWD links. Source status: claimed-ongoing; not independently verified. Owner: City of Newport Beach. Timing: Not specified.

This review evaluates the response document. Implementation claims have not been independently verified.

El Toro Water District

Agency plans to implement

Continue evaluating coordination opportunities; no specific date/action promised beyond evaluation.

Read official response · PDF page 3

Continue evaluating coordination opportunities; no specific date/action promised beyond evaluation. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

This review evaluates the response document. Implementation claims have not been independently verified.

East Orange County Water District

Agency position unclear

Own/OCWD websites and OCWD monthly newsletter updates continuing.

Read official response · PDF page 2

Own/OCWD websites and OCWD monthly newsletter updates continuing. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

  • Respondent reports: Continue educational information on own/OCWD websites and OCWD newsletter. Source status: claimed-ongoing; not independently verified. Owner: East Orange County Water District. Timing: Not specified.

This review evaluates the response document. Implementation claims have not been independently verified.

City of Fullerton

Agency plans to implement

Continue OCWD coordination; conclusion adopts September 30, 2026 deadline; ongoing OCWD website/newsletter distribution.

Read official response · PDF page 2

Continue OCWD coordination; conclusion adopts September 30, 2026 deadline; ongoing OCWD website/newsletter distribution. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

  • Respondent describes: Continue OCWD coordination and implement R5 by specified report deadline. Source status: future; not independently verified. Owner: City of Fullerton. Timing: 2026-09-30.

This review evaluates the response document. Implementation claims have not been independently verified.

Irvine Ranch Water District

Agency declines implementation

Declines expansion given existing outreach; claims over four million 2025 and almost three million 2026 touchpoints, workshops/tours/web/social media/reports; continued retailer coordination as appropriate.

Read official response · PDF page 5

Declines expansion given existing outreach; claims over four million 2025 and almost three million 2026 touchpoints, workshops/tours/web/social media/reports; continued retailer coordination as appropriate. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF pages 5–6. Engagement is not independent factual, legal or implementation verification.

  • Respondent reports: Continue social media/workshops/tours/web/quality reports and coordination as appropriate rather than expand outreach. Conditions/limits: Expansion explicitly refused as unwarranted; claimed 4 million 2025/almost 3 million 2026 touchpoints not independently verified. Source status: claimed-ongoing-with-refusal; not independently verified. Owner: Irvine Ranch Water District. Timing: Not specified.

This review evaluates the response document. Implementation claims have not been independently verified.

Back to all recommendationsExplore this cycle’s discussion questions