Recommendation R1
Upgrade the slower of the Eel River Fire Camp internet networks to current standards for upload and download internet speeds by July 1, 2027. (F6)
Jury report: Fighting Fires, Changing Lives: Eel River Conservation Camp · PDF page 23
Permanent linkOfficial responses
No response recorded
A matching agency response has not been added to Grand Jury Hub. This does not establish whether a response was submitted or is overdue.