Skip to content
Grand Jury Hub
← Report overview
Response synthesis and audit

PFAS and Public Awareness: A Closer Look at Orange County Drinking Water — submitted responses

Joint County evidence names BOS and HCA separately; shared original is published once, without duplicate actions. Santa Ana supplies only an extension request. Utility service areas/source-versus-delivered results and reporting limits are material. Non-detect and source safety claims are not independent certification. YLWD disputes the report's connection count; originals remain unchanged. Annual visible editing remnants do not alter primary standalone items. The default download opens Orange County Water District. Each audit selects its own unchanged original and letter date; other originals, proposals and requests are separately linked.

Response by Golden State Water Company; City of Westminster; City of La Palma; South Coast Water District; Serrano Water District; City of Huntington Beach; Mesa Water District; City of Orange; Orange County Board of Supervisors; Orange County Health Care Agency; City of Buena Park; Orange County Water District; Emerald Bay Service District; Trabuco Canyon Water District; City of Fountain Valley; Santa Margarita Water District; Moulton Niguel Water District; Yorba Linda Water District; City of Anaheim; City of Garden Grove; City of Seal Beach; City of Tustin; City of San Clemente; City of La Habra; City of Brea; Laguna Beach County Water District; City of Newport Beach; El Toro Water District; East Orange County Water District; City of Fullerton; Irvine Ranch Water District

172

Addressed

20

Partially addressed

2

Not addressed

0

Unclear

County's stated disposition

These categories reflect the County's response to each recommendation, separate from this audit's assessment.

29

Implemented

16

Will be implemented

2

Requires further analysis

5

Will not be implemented

30

Unclear

How to read this audit

Scores assess the cited document's position, disputed scope, explanation and usefulness, not truth, agreement, legal compliance or independently verified implementation. Explained refusal can be addressed. Implementation disposition is separate from engagement assessment; an unclear disposition can coexist with substantive engagement, and a refusal can include qualified offers. Joint County evidence names BOS and HCA separately; shared original is published once, without duplicate actions. Santa Ana supplies only an extension request. Utility service areas/source-versus-delivered results and reporting limits are material. Non-detect and source safety claims are not independent certification. YLWD disputes the report's connection count; originals remain unchanged. Annual visible editing remnants do not alter primary standalone items.

Commitments

Actions stated in the response

These are commitments extracted from the County's response. They describe what the response says will happen; they do not verify that implementation occurred.

68

Extracted commitments

21

Definite or bounded timing

2

Conditional timing

45

No timeframe

golden-state-water-company-r2 · No timeframe stated

Respondent describes: Continue Orange County Basin groundwater PFAS monitoring and construct/operate treatment where required. Conditions/limits: Site-by-site feasibility, cost-effectiveness, alternative supplies and timing; exceedance alone not sole driver. Source status: partially-implemented; not independently verified.

No target date stated

golden-state-water-company-r4 · Exact date

Respondent describes: Post PFAS treatment status online and link latest CCR compliance information; improve plain-language communication. Source status: partially-implemented; not independently verified.

2029-07-01

golden-state-water-company-r5 · Exact date

Respondent describes: Add website design/construction project status and OCWD PFAS link. Source status: future; not independently verified.

2026-09-30

city-of-westminster-r2 · No timeframe stated

Respondent reports: Continue stated OCWD-linked PFAS monitoring program, including cited UCMR3/5 and DDW orders; OCWD policy funds 100% design/construction and 50% eligible O&M where described. No universal local treatment-completion date inferred. Source status: claimed-ongoing; not independently verified.

No target date stated

city-of-westminster-r4 · No timeframe stated

Respondent reports: 2025 CCR PFAS advisory/compliance information also on city website. Source status: claimed-completed; not independently verified.

No target date stated

city-of-westminster-r5 · No timeframe stated

Respondent reports: Coordinate public PFAS education with OCWD/regional partners and provide educational material at community events. Source status: claimed-ongoing; not independently verified.

No target date stated

city-of-la-palma-r2 · No timeframe stated

Respondent reports: Monitor all city sources; reports non-detect PFAS. Source status: claimed-ongoing; not independently verified.

No target date stated

city-of-la-palma-r4 · No timeframe stated

Respondent reports: Provide PFAS information on website and CCR. Source status: claimed-completed; not independently verified.

No target date stated

south-coast-water-district-f2 · No timeframe stated

Respondent reports: Quarterly Stonehill source/GRF treated-water monitoring; RO average PFAS removal claimed 98.8%. Source status: claimed-ongoing; not independently verified.

No target date stated

south-coast-water-district-r4 · Exact date

Respondent describes: Enhance SCWD and JRWSS CCR source/treatment/monitoring/compliance detail. Conditions/limits: GRF existing RO, no added PFAS-specific infrastructure planned. Source status: partially-implemented; not independently verified.

2029-07-01

south-coast-water-district-r4 · No timeframe stated

Respondent describes: Doheny desalination RO operations anticipated in 2030; PFAS-relevant education where appropriate. Conditions/limits: Project in pre-construction; 2030 anticipation not guaranteed deadline. Source status: planned; not independently verified.

No target date stated

south-coast-water-district-r5 · Exact date

Respondent describes: Send dedicated PFAS communication to full customer list; add plain-language water-quality webpage with source/treatment/regulatory resources; coordinate relevant imported-water messages with MWDOC. Conditions/limits: No real-time/continuously updated online monitoring data; specific results through district staff. Source status: future; not independently verified.

2026-09-30

serrano-water-district-r2 · No timeframe stated

Respondent reports: C.L. Larry Pharris Jr. plant operating since February 2022 treats 100% groundwater; all-well monitoring with OCWD. Source status: claimed-completed; not independently verified.

No target date stated

serrano-water-district-r5 · No timeframe stated

Respondent reports: Continue OCWD-coordinated website PFAS information/resources/updates. Source status: claimed-ongoing; not independently verified.

No target date stated

city-of-huntington-beach-r2 · No timeframe stated

Respondent reports: Continue stated OCWD-linked PFAS monitoring program, including cited UCMR3/5 and DDW orders; OCWD policy funds 100% design/construction and 50% eligible O&M where described. No universal local treatment-completion date inferred. Source status: claimed-ongoing; not independently verified.

No target date stated

city-of-huntington-beach-r4 · No timeframe stated

Respondent reports: CCR and website PFAS advisory/compliance information. Source status: claimed-completed; not independently verified.

No target date stated

city-of-huntington-beach-r5 · No timeframe stated

Respondent reports: Continue website/CCR information and OCWD references; Surf City Nights/Citizens Academy outreach. Source status: claimed-ongoing; not independently verified.

No target date stated

mesa-water-district-r2 · No timeframe stated

Respondent reports: Collect PFAS monitoring samples with OCWD and work with DDW if applicable standards exceeded. Conditions/limits: No reportable source detections claimed; no new treatment milestone stated. Source status: claimed-ongoing; not independently verified.

No target date stated

city-of-orange-r2 · Exact date

Respondent describes: Eight treated operating groundwater wells; four additional wells at three locations in design with construction early 2027 and completion by July 1, 2029. Conditions/limits: Exceeding wells removed from operation until treatment. Source status: partially-implemented; not independently verified.

2029-07-01

city-of-orange-r4 · Exact date

Respondent describes: CCR/website appropriate advisory and compliance information by July 1, 2029. Conditions/limits: Advisory only when required by legally defined PFAS detection; not unconditional annual advisory. Source status: future; not independently verified.

2029-07-01

city-of-orange-r5 · No timeframe stated

Respondent reports: Continue social media, tours, community events and student engagement on drinking-water safety. Source status: claimed-ongoing; not independently verified.

No target date stated

orange-county-executive-office-r3-orange-county-health-care-agency · No timeframe stated

Respondent reports: HCA has communicated and agreed with OCWD to collaborate on updating/posting public educational materials. Conditions/limits: County cannot direct OCWD; agreement is not verification materials posted. Source status: claimed-implemented-agreement; not independently verified.

No target date stated

city-of-buena-park-r2 · No timeframe stated

Respondent reports: Continue stated OCWD-linked PFAS monitoring program, including cited UCMR3/5 and DDW orders; OCWD policy funds 100% design/construction and 50% eligible O&M where described. No universal local treatment-completion date inferred. Source status: claimed-ongoing; not independently verified.

No target date stated

city-of-buena-park-r4 · Exact date

Respondent describes: Implement full R4 CCR/website advisory, status and compliance content. Source status: future; not independently verified.

2029-07-01

city-of-buena-park-r5 · Exact date

Respondent describes: Explore additional marketing methods such as website and water-bill inserts with OCWD. Source status: future; not independently verified.

2026-09-20

orange-county-water-district-r1 · No timeframe stated

Respondent reports: Sued PFAS manufacturers; settlements reached and $78 million received with additional payments/settlements expected. Conditions/limits: Expected future settlements not guaranteed recovery. Source status: claimed-completed; not independently verified.

No target date stated

orange-county-water-district-r2 · No timeframe stated

Respondent reports: Continue stated OCWD-linked PFAS monitoring program, including cited UCMR3/5 and DDW orders; OCWD policy funds 100% design/construction and 50% eligible O&M where described. No universal local treatment-completion date inferred. Source status: claimed-ongoing; not independently verified.

No target date stated

orange-county-water-district-r3 · No timeframe stated

Respondent reports: Continue scientific/regulatory/treatment updates through website/social media, Quarterly PFAS Updates and Hydrospectives. Source status: claimed-ongoing; not independently verified.

No target date stated

orange-county-water-district-r6 · No timeframe stated

Respondent reports: Continue information sharing with local/national/international water agencies on treatment research/technologies/compliance. Source status: claimed-ongoing; not independently verified.

No target date stated

emerald-bay-water-district-r4 · Exact date

Respondent describes: Work with LBCWD on CCR advisory/compliance/treatment detail and EBSD web links. Conditions/limits: 100% LBCWD purchased supply; no own wells or upstream process control. Source status: future; not independently verified.

2029-07-01

emerald-bay-water-district-r5 · Exact date

Respondent describes: Publish customer-facing PFAS/safety communications, website updates/links with LBCWD and OCWD where applicable. Source status: future; not independently verified.

2026-09-30

trabuco-canyon-water-district-r4 · No timeframe stated

Respondent reports: Provide PFAS CCR information with MWDOC-served agencies. Conditions/limits: No source detections or PFAS treatment facilities asserted. Source status: claimed-completed; not independently verified.

No target date stated

city-of-fountain-valley-r2 · No timeframe stated

Respondent reports: Continue stated OCWD-linked PFAS monitoring program, including cited UCMR3/5 and DDW orders; OCWD policy funds 100% design/construction and 50% eligible O&M where described. No universal local treatment-completion date inferred. Source status: claimed-ongoing; not independently verified.

No target date stated

city-of-fountain-valley-r4 · Exact date

Respondent describes: Refine CCR/public messaging through July 1, 2029; existing CCR/Public Health Goals metrics/hearings. Conditions/limits: Where applicable; anticipated implementation. Source status: partially-implemented; not independently verified.

2029-07-01

city-of-fountain-valley-r5 · Exact date

Respondent describes: Update website with graphics, simplified data and OCWD/DDW/EPA links; continue joint campaigns/events. Source status: future; not independently verified.

2026-09-30

santa-margarita-water-district-r4 · No timeframe stated

Respondent reports: Provide relevant PFAS CCR and website information. Source status: claimed-completed; not independently verified.

No target date stated

moulton-niguel-water-district-r4 · Exact date

Respondent describes: Add dedicated PFAS information to website; existing non-detect notice in Water Quality Report online/print. Source status: partially-implemented; not independently verified.

2029-07-01

moulton-niguel-water-district-r5 · No timeframe stated

Respondent reports: Maintain listed localized CCR/newsletter/bill/speakers/email/web/social-media education rather than expand it; coordinate as appropriate. Conditions/limits: Expansion explicitly will not be implemented; existing/planned efforts considered sufficient. Source status: claimed-ongoing-with-refusal; not independently verified.

No target date stated

yorba-linda-water-district-r2 · No timeframe stated

Respondent reports: Continue stated OCWD-linked PFAS monitoring program, including cited UCMR3/5 and DDW orders; OCWD policy funds 100% design/construction and 50% eligible O&M where described. No universal local treatment-completion date inferred. Source status: claimed-ongoing; not independently verified.

No target date stated

yorba-linda-water-district-r2 · No timeframe stated

Respondent reports: Treat all service-area groundwater; pilot program at headquarters. Source status: claimed-completed; not independently verified.

No target date stated

yorba-linda-water-district-r5 · No timeframe stated

Respondent reports: Continue treatment tours, annual open house, recurring events and district publications. Source status: claimed-ongoing; not independently verified.

No target date stated

city-of-anaheim-r2 · Exact date

Respondent describes: Nine operational treatment locations/14 wells Phases A/B; four wells/four locations rehabilitating and Phase C construction late 2026, operational by July 1, 2029. Source status: partially-implemented; not independently verified.

2029-07-01

city-of-anaheim-r4 · Exact date

Respondent describes: Incorporate recommended advisory/status/compliance topics in CCR and website. Source status: partially-implemented; not independently verified.

2027-07-01

city-of-anaheim-r5 · No timeframe stated

Respondent reports: Continue described community events/tours/student engagement/public information/social media. Source status: claimed-ongoing; not independently verified.

No target date stated

city-of-garden-grove-r4 · No timeframe stated

Respondent reports: Maintain PFAS water-quality webpage and CCR information at identified URLs. Source status: claimed-completed; not independently verified.

No target date stated

city-of-garden-grove-r5 · No timeframe stated

Respondent reports: Continue CCR, website, social media and responses to inquiries with OCWD. Source status: claimed-ongoing; not independently verified.

No target date stated

city-of-seal-beach-r2 · Conditional timing

Conditional offer: Evaluate and implement appropriate response actions if source exceeds applicable PFAS response levels/thresholds. Conditions/limits: No city surface-water source facilities; OCWD monitors groundwater. Not unconditional promise treatment only. Source status: conditional-future; not independently verified.

No city surface-water source facilities; OCWD monitors groundwater. Not unconditional promise treatment only.

city-of-seal-beach-r4 · No timeframe stated

Respondent describes: Provide required CCR information and PFAS-related advisory/compliance/website updates as applicable. Conditions/limits: Future monitoring/regulatory requirements/OCWD coordination; facilities currently inapplicable; no firm date. Source status: partial-future; not independently verified.

No target date stated

city-of-seal-beach-r5 · No timeframe stated

Respondent describes: Coordinate future public education using existing website/report/customer-service channels. Conditions/limits: Collectively agreeable date not specified; avoid duplication and undue resource impacts. Source status: future; not independently verified.

No target date stated

city-of-tustin-r2 · No timeframe stated

Respondent reports: Continue stated OCWD-linked PFAS monitoring program, including cited UCMR3/5 and DDW orders; OCWD policy funds 100% design/construction and 50% eligible O&M where described. No universal local treatment-completion date inferred. Source status: claimed-ongoing; not independently verified.

No target date stated

city-of-tustin-r4 · No timeframe stated

Respondent describes: Update city website PFAS/facilities information and continue CCR compliance. Conditions/limits: Requires further analysis; scope/timeframe not supplied. Source status: partial-future; not independently verified.

No target date stated

city-of-tustin-r5 · No timeframe stated

Respondent reports: Continue OCWD-coordinated website PFAS information/resources/updates. Source status: claimed-ongoing; not independently verified.

No target date stated

city-of-san-clemente-r4 · Exact date

Respondent describes: Add more website PFAS information; Annual CCR already has information. Source status: partially-implemented; not independently verified.

2029-07-01

city-of-san-clemente-r5 · Exact date

Respondent describes: Enhance coordinated public education. Conditions/limits: No discrete method specified. Source status: future; not independently verified.

2026-09-30

city-of-la-habra-r4 · No timeframe stated

Analysis or consideration, not implementation: Continue quarterly Idaho Well monitoring through April 2027 to complete initial monitoring, then determine advisory/status/reporting need. Conditions/limits: April 2027 supplied as monitoring end, not firm advisory-publication date. Source status: analysis-in-progress; not independently verified.

No target date stated

city-of-la-habra-r5 · No timeframe stated

Respondent reports: Maintain La Habra Life newsletter, Life in La Habra magazine and community booths. Conditions/limits: No specific PFAS coordination detailed. Source status: claimed-completed; not independently verified.

No target date stated

laguna-beach-water-district-r4 · Exact date

Respondent describes: Implement full R4. Source status: future; not independently verified.

2029-07-01

laguna-beach-water-district-r5 · Exact date

Respondent describes: Coordinate OCWD/regional education implementation. Source status: future; not independently verified.

2026-09-30

city-of-newport-beach-r2 · No timeframe stated

Respondent reports: Continue monitoring/testing and posting all PFAS testing data online; no distribution-system detections claimed. Source status: claimed-ongoing; not independently verified.

No target date stated

city-of-newport-beach-r4 · Exact date

Respondent describes: Website portion complete; CCR portion to be implemented within required timeline. Source status: partially-implemented; not independently verified.

2029-07-01

city-of-newport-beach-r5 · No timeframe stated

Respondent reports: Continue website PFAS education and OCWD links. Source status: claimed-ongoing; not independently verified.

No target date stated

el-toro-water-district-r4 · No timeframe stated

Respondent describes: PFAS page already added to redesigned website; launch shortly; consider CCR advisory. Conditions/limits: Website not yet launched; no firm calendar date; CCR advisory only under consideration. Source status: partially-implemented; not independently verified.

No target date stated

east-orange-county-water-district-r2 · No timeframe stated

Respondent reports: Continue stated OCWD-linked PFAS monitoring program, including cited UCMR3/5 and DDW orders; OCWD policy funds 100% design/construction and 50% eligible O&M where described. No universal local treatment-completion date inferred. Source status: claimed-ongoing; not independently verified.

No target date stated

east-orange-county-water-district-r5 · No timeframe stated

Respondent reports: Continue educational information on own/OCWD websites and OCWD newsletter. Source status: claimed-ongoing; not independently verified.

No target date stated

city-of-fullerton-r5 · Exact date

Respondent describes: Continue OCWD coordination and implement R5 by specified report deadline. Source status: future; not independently verified.

2026-09-30

irvine-ranch-water-district-r2 · No timeframe stated

Respondent reports: All-source PFAS monitoring; 2018 positive well shut down until treatment and returned to service. Conditions/limits: Approach may pause sources, blend or treat; no detect in delivered water does not mean all source samples non-detect. Source status: claimed-completed; not independently verified.

No target date stated

irvine-ranch-water-district-r4 · Conditional timing

Conditional offer: Continue disclosure of source results and facilities status; CCR/website advisory if federally defined detection requires it. Conditions/limits: Rejects recommendation for consistent advisory irrespective of detection; preserves partial/conditional commitment. Source status: conditional-future-with-refusal; not independently verified.

2029-07-01

irvine-ranch-water-district-r5 · No timeframe stated

Respondent reports: Continue social media/workshops/tours/web/quality reports and coordination as appropriate rather than expand outreach. Conditions/limits: Expansion explicitly refused as unwarranted; claimed 4 million 2025/almost 3 million 2026 touchpoints not independently verified. Source status: claimed-ongoing-with-refusal; not independently verified.

No target date stated

Item-by-item review

Findings and recommendations

Assessments describe whether the response engages each cited item. Finding scores separately describe statutory-elements completeness under California Penal Code § 933.05(a) and public usefulness. They do not independently verify the response or constitute a legal conclusion.

Showing 194 of 194 items

finding · golden-state-water-company-f2

Finding F2

Audit: Addressed

Response says

Cites Title 22 Chapter 15 Article 20 and HSC §116470 for CCR reporting.

Audit analysis

Cites Title 22 Chapter 15 Article 20 and HSC §116470 for CCR reporting. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Cites Title 22 Chapter 15 Article 20 and HSC §116470 for CCR reporting. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · golden-state-water-company-f4

Finding F4

Audit: Addressed

Response says

Describes collaboration and participation at several Orange County groundwater production sites.

Audit analysis

Describes collaboration and participation at several Orange County groundwater production sites. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

9/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

5/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
1/2

Describes collaboration and participation at several Orange County groundwater production sites. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · golden-state-water-company-f6

Finding F6

Audit: Addressed

Response says

Expressly limits concurrence and safety assertion to water served to GSWC customers; no supporting test record identified.

Audit analysis

Expressly limits concurrence and safety assertion to water served to GSWC customers; no supporting test record identified. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

4/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

0/6

Public usefulness

Coverage
0/2
Reason specificity
0/2
Support traceability
0/2

Expressly limits concurrence and safety assertion to water served to GSWC customers; no supporting test record identified. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · golden-state-water-company-f8

Finding F8

Audit: Addressed

Response says

Identifies own PFAS landing page, EPA/GSWC fact sheets and 2025 CCR language; expressly has not independently verified other retailers.

Audit analysis

Identifies own PFAS landing page, EPA/GSWC fact sheets and 2025 CCR language; expressly has not independently verified other retailers. Physical report PDF page 36; selected response PDF pages 2–3. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Identifies own PFAS landing page, EPA/GSWC fact sheets and 2025 CCR language; expressly has not independently verified other retailers. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

recommendation · golden-state-water-company-r2

Recommendation R2

County: UnclearAudit: Addressed

Response says

Decade of groundwater monitoring with OCWD; facilities on schedule where required. Treatment selected site by site using feasibility, cost, alternative supplies and timing, not response levels alone.

Audit analysis

Decade of groundwater monitoring with OCWD; facilities on schedule where required. Treatment selected site by site using feasibility, cost, alternative supplies and timing, not response levels alone. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent describes: Continue Orange County Basin groundwater PFAS monitoring and construct/operate treatment where required. Conditions/limits: Site-by-site feasibility, cost-effectiveness, alternative supplies and timing; exceedance alone not sole driver. Source status: partially-implemented; not independently verified.

Responsible party
Golden State Water Company
Timing
No timeframe stated

recommendation · golden-state-water-company-r4

Recommendation R4

County: UnclearAudit: Addressed

Response says

Will post treatment status online and link latest CCR compliance information before July 1, 2029; cites education since 2019 and CCR information since 2020.

Audit analysis

Will post treatment status online and link latest CCR compliance information before July 1, 2029; cites education since 2019 and CCR information since 2020. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF pages 3–4. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent describes: Post PFAS treatment status online and link latest CCR compliance information; improve plain-language communication. Source status: partially-implemented; not independently verified.

Responsible party
Golden State Water Company
Timing
2029-07-01 · Exact date

recommendation · golden-state-water-company-r5

Recommendation R5

County: Will be implementedAudit: Addressed

Response says

Will add project design/construction status and OCWD PFAS link; collaboration whenever possible.

Audit analysis

Will add project design/construction status and OCWD PFAS link; collaboration whenever possible. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 4. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent describes: Add website design/construction project status and OCWD PFAS link. Source status: future; not independently verified.

Responsible party
Golden State Water Company
Timing
2026-09-30 · Exact date

finding · city-of-westminster-f2

Finding F2

Audit: Addressed

Response says

Qualifies reporting by state Report Detection Level and DDW requirements; explicit position limited to reporting proposition.

Audit analysis

Qualifies reporting by state Report Detection Level and DDW requirements; explicit position limited to reporting proposition. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Qualifies reporting by state Report Detection Level and DDW requirements; explicit position limited to reporting proposition. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-westminster-f4

Finding F4

Audit: Addressed

Response says

Concurrence scoped to proactive role in basin and supply; no specific treatment evidence.

Audit analysis

Concurrence scoped to proactive role in basin and supply; no specific treatment evidence. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

7/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

3/6

Public usefulness

Coverage
2/2
Reason specificity
1/2
Support traceability
0/2

Concurrence scoped to proactive role in basin and supply; no specific treatment evidence. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-westminster-f6

Finding F6

Audit: Addressed

Response says

Bare agreement.

Audit analysis

Bare agreement. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

4/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

0/6

Public usefulness

Coverage
0/2
Reason specificity
0/2
Support traceability
0/2

Bare agreement. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-westminster-f8

Finding F8

Audit: Partially addressed

Response says

Describes own 2025 CCR and website reference to OCWD but does not expressly agree or disagree with countywide finding.

Audit analysis

Describes own 2025 CCR and website reference to OCWD but does not expressly agree or disagree with countywide finding. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

9/10

3/4

Statutory elements

Stated position
1/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Describes own 2025 CCR and website reference to OCWD but does not expressly agree or disagree with countywide finding. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

recommendation · city-of-westminster-r2

Recommendation R2

County: UnclearAudit: Addressed

Response says

Describes joint monitoring, UCMR3/5, DDW orders, OCWD pilot testing and 100% capital/50% O&M policy; no specific Westminster treatment schedule.

Audit analysis

Describes joint monitoring, UCMR3/5, DDW orders, OCWD pilot testing and 100% capital/50% O&M policy; no specific Westminster treatment schedule. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: Continue stated OCWD-linked PFAS monitoring program, including cited UCMR3/5 and DDW orders; OCWD policy funds 100% design/construction and 50% eligible O&M where described. No universal local treatment-completion date inferred. Source status: claimed-ongoing; not independently verified.

Responsible party
City of Westminster
Timing
No timeframe stated

recommendation · city-of-westminster-r4

Recommendation R4

County: UnclearAudit: Addressed

Response says

Says 2025 CCR and website contain PFAS advisory/compliance information in clear language; treatment-facility status not specified.

Audit analysis

Says 2025 CCR and website contain PFAS advisory/compliance information in clear language; treatment-facility status not specified. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: 2025 CCR PFAS advisory/compliance information also on city website. Source status: claimed-completed; not independently verified.

Responsible party
City of Westminster
Timing
No timeframe stated

recommendation · city-of-westminster-r5

Recommendation R5

County: UnclearAudit: Addressed

Response says

Will coordinate with OCWD/regional partners; points customers to OCWD and participates in community outreach.

Audit analysis

Will coordinate with OCWD/regional partners; points customers to OCWD and participates in community outreach. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: Coordinate public PFAS education with OCWD/regional partners and provide educational material at community events. Source status: claimed-ongoing; not independently verified.

Responsible party
City of Westminster
Timing
No timeframe stated

finding · city-of-la-palma-f2

Finding F2

Audit: Addressed

Response says

Bare agreement.

Audit analysis

Bare agreement. Physical report PDF page 36; selected response PDF page 1. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

4/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

0/6

Public usefulness

Coverage
0/2
Reason specificity
0/2
Support traceability
0/2

Bare agreement. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-la-palma-f4

Finding F4

Audit: Addressed

Response says

Bare agreement.

Audit analysis

Bare agreement. Physical report PDF page 36; selected response PDF page 1. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

4/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

0/6

Public usefulness

Coverage
0/2
Reason specificity
0/2
Support traceability
0/2

Bare agreement. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-la-palma-f6

Finding F6

Audit: Addressed

Response says

Bare agreement.

Audit analysis

Bare agreement. Physical report PDF page 36; selected response PDF page 1. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

4/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

0/6

Public usefulness

Coverage
0/2
Reason specificity
0/2
Support traceability
0/2

Bare agreement. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-la-palma-f8

Finding F8

Audit: Addressed

Response says

Own website PFAS section identified by URL; refers to OCWD, EPA, SWRCB and FDA. Scope of qualification is own outreach.

Audit analysis

Own website PFAS section identified by URL; refers to OCWD, EPA, SWRCB and FDA. Scope of qualification is own outreach. Physical report PDF page 36; selected response PDF pages 1–2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Own website PFAS section identified by URL; refers to OCWD, EPA, SWRCB and FDA. Scope of qualification is own outreach. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

recommendation · city-of-la-palma-r2

Recommendation R2

County: ImplementedAudit: Addressed

Response says

Reports monitoring all sources with non-detect PFAS; no treatment needed asserted.

Audit analysis

Reports monitoring all sources with non-detect PFAS; no treatment needed asserted. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: Monitor all city sources; reports non-detect PFAS. Source status: claimed-ongoing; not independently verified.

Responsible party
City of La Palma
Timing
No timeframe stated

recommendation · city-of-la-palma-r4

Recommendation R4

County: ImplementedAudit: Addressed

Response says

Reports non-detect monitoring and information on website/CCR; no distinct treatment-status content described.

Audit analysis

Reports non-detect monitoring and information on website/CCR; no distinct treatment-status content described. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: Provide PFAS information on website and CCR. Source status: claimed-completed; not independently verified.

Responsible party
City of La Palma
Timing
No timeframe stated

recommendation · city-of-la-palma-r5

Recommendation R5

County: ImplementedAudit: Addressed

Response says

Website/CCR information will continue; no discrete new enhancement described.

Audit analysis

Website/CCR information will continue; no discrete new enhancement described. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

finding · south-coast-water-district-f2

Finding F2

Audit: Addressed

Response says

Accepts widespread contamination, disputes current federal compliance-CCR timing citing April 26, 2027. Describes quarterly Stonehill/GRF monitoring, source detections and claimed average 98.8% RO removal with delivered water below MCLs.

Audit analysis

Accepts widespread contamination, disputes current federal compliance-CCR timing citing April 26, 2027. Describes quarterly Stonehill/GRF monitoring, source detections and claimed average 98.8% RO removal with delivered water below MCLs. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Accepts widespread contamination, disputes current federal compliance-CCR timing citing April 26, 2027. Describes quarterly Stonehill/GRF monitoring, source detections and claimed average 98.8% RO removal with delivered water below MCLs. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

Extracted commitments

Respondent reports: Quarterly Stonehill source/GRF treated-water monitoring; RO average PFAS removal claimed 98.8%. Source status: claimed-ongoing; not independently verified.

Responsible party
South Coast Water District
Timing
No timeframe stated

finding · south-coast-water-district-f6

Finding F6

Audit: Addressed

Response says

Scopes water-quality assertions to SCWD deliveries; cites 2026 Annual Water Quality Report no MCL violations and GRF reverse osmosis.

Audit analysis

Scopes water-quality assertions to SCWD deliveries; cites 2026 Annual Water Quality Report no MCL violations and GRF reverse osmosis. Physical report PDF page 36; selected response PDF pages 2–3. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Scopes water-quality assertions to SCWD deliveries; cites 2026 Annual Water Quality Report no MCL violations and GRF reverse osmosis. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · south-coast-water-district-f8

Finding F8

Audit: Addressed

Response says

Identifies advisory sections in 2025 and 2026 SCWD/JRWSS CCRs, but acknowledges general content lacks own results, treatment capabilities and compliance detail.

Audit analysis

Identifies advisory sections in 2025 and 2026 SCWD/JRWSS CCRs, but acknowledges general content lacks own results, treatment capabilities and compliance detail. Physical report PDF page 36; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Identifies advisory sections in 2025 and 2026 SCWD/JRWSS CCRs, but acknowledges general content lacks own results, treatment capabilities and compliance detail. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

recommendation · south-coast-water-district-r4

Recommendation R4

County: Will be implementedAudit: Addressed

Response says

Will enhance both SCWD/JRWSS CCRs with source, treatment, monitoring and compliance detail and add plain-language website information. No real-time/continuously updated online data: not required or operationally feasible; specific results via staff. Existing RO, no additional PFAS-specific infrastructure planned.

Audit analysis

Will enhance both SCWD/JRWSS CCRs with source, treatment, monitoring and compliance detail and add plain-language website information. No real-time/continuously updated online data: not required or operationally feasible; specific results via staff. Existing RO, no additional PFAS-specific infrastructure planned. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF pages 3–4. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent describes: Enhance SCWD and JRWSS CCR source/treatment/monitoring/compliance detail. Conditions/limits: GRF existing RO, no added PFAS-specific infrastructure planned. Source status: partially-implemented; not independently verified.

Responsible party
South Coast Water District
Timing
2029-07-01 · Exact date

Respondent describes: Doheny desalination RO operations anticipated in 2030; PFAS-relevant education where appropriate. Conditions/limits: Project in pre-construction; 2030 anticipation not guaranteed deadline. Source status: planned; not independently verified.

Responsible party
South Coast Water District
Timing
No timeframe stated

recommendation · south-coast-water-district-r5

Recommendation R5

County: Will be implementedAudit: Addressed

Response says

Dedicated communication to full customer list, website information, MWDOC coordination for relevant imported-supply messaging by stated date. Doheny PFAS-relevant messaging where appropriate.

Audit analysis

Dedicated communication to full customer list, website information, MWDOC coordination for relevant imported-supply messaging by stated date. Doheny PFAS-relevant messaging where appropriate. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF pages 4–5. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent describes: Send dedicated PFAS communication to full customer list; add plain-language water-quality webpage with source/treatment/regulatory resources; coordinate relevant imported-water messages with MWDOC. Conditions/limits: No real-time/continuously updated online monitoring data; specific results through district staff. Source status: future; not independently verified.

Responsible party
South Coast Water District
Timing
2026-09-30 · Exact date

finding · serrano-water-district-f2

Finding F2

Audit: Addressed

Response says

Reporting concurrence qualified by state detection level and DDW requirements.

Audit analysis

Reporting concurrence qualified by state detection level and DDW requirements. Physical report PDF page 36; selected response PDF page 1. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Reporting concurrence qualified by state detection level and DDW requirements. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · serrano-water-district-f4

Finding F4

Audit: Addressed

Response says

All active SWD wells have PFAS treatment; describes OCWD partnership and regulatory purpose.

Audit analysis

All active SWD wells have PFAS treatment; describes OCWD partnership and regulatory purpose. Physical report PDF page 36; selected response PDF page 1. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

9/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

5/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
1/2

All active SWD wells have PFAS treatment; describes OCWD partnership and regulatory purpose. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · serrano-water-district-f6

Finding F6

Audit: Addressed

Response says

Bare agreement expressly limited to SWD supply.

Audit analysis

Bare agreement expressly limited to SWD supply. Physical report PDF page 36; selected response PDF page 1. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

4/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

0/6

Public usefulness

Coverage
0/2
Reason specificity
0/2
Support traceability
0/2

Bare agreement expressly limited to SWD supply. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · serrano-water-district-f8

Finding F8

Audit: Addressed

Response says

Identifies own website and facility/actions fact sheet as basis for disagreement about own outreach.

Audit analysis

Identifies own website and facility/actions fact sheet as basis for disagreement about own outreach. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Identifies own website and facility/actions fact sheet as basis for disagreement about own outreach. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

recommendation · serrano-water-district-r2

Recommendation R2

County: ImplementedAudit: Addressed

Response says

All-well monitoring with OCWD; C.L. Larry Pharris Jr. plant operating since February 2022 treats 100% groundwater supply.

Audit analysis

All-well monitoring with OCWD; C.L. Larry Pharris Jr. plant operating since February 2022 treats 100% groundwater supply. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: C.L. Larry Pharris Jr. plant operating since February 2022 treats 100% groundwater; all-well monitoring with OCWD. Source status: claimed-completed; not independently verified.

Responsible party
Serrano Water District
Timing
No timeframe stated

recommendation · serrano-water-district-r4

Recommendation R4

County: UnclearAudit: Addressed

Response says

Describes monitoring/treatment and future CCR compliance plus website updates, not explicit all-topic advisory commitment or deadline.

Audit analysis

Describes monitoring/treatment and future CCR compliance plus website updates, not explicit all-topic advisory commitment or deadline. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

recommendation · serrano-water-district-r5

Recommendation R5

County: ImplementedAudit: Addressed

Response says

Coordination with OCWD and continued website educational information/resources/updates.

Audit analysis

Coordination with OCWD and continued website educational information/resources/updates. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: Continue OCWD-coordinated website PFAS information/resources/updates. Source status: claimed-ongoing; not independently verified.

Responsible party
Serrano Water District
Timing
No timeframe stated

finding · city-of-huntington-beach-f2

Finding F2

Audit: Addressed

Response says

Reporting qualified by DDW requirements; points to current CCR.

Audit analysis

Reporting qualified by DDW requirements; points to current CCR. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Reporting qualified by DDW requirements; points to current CCR. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-huntington-beach-f4

Finding F4

Audit: Addressed

Response says

Accepts leadership and varying implementation; adds general compliance assertion without checkable local project evidence.

Audit analysis

Accepts leadership and varying implementation; adds general compliance assertion without checkable local project evidence. Physical report PDF page 36; selected response PDF pages 2–3. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

7/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

3/6

Public usefulness

Coverage
2/2
Reason specificity
1/2
Support traceability
0/2

Accepts leadership and varying implementation; adds general compliance assertion without checkable local project evidence. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-huntington-beach-f6

Finding F6

Audit: Addressed

Response says

Bare agreement.

Audit analysis

Bare agreement. Physical report PDF page 36; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

4/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

0/6

Public usefulness

Coverage
0/2
Reason specificity
0/2
Support traceability
0/2

Bare agreement. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-huntington-beach-f8

Finding F8

Audit: Partially addressed

Response says

Own PFAS webpage, 2025 CCR advisory, OCWD fact sheet and quarterly updates identified; no express position on countywide finding.

Audit analysis

Own PFAS webpage, 2025 CCR advisory, OCWD fact sheet and quarterly updates identified; no express position on countywide finding. Physical report PDF page 36; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

9/10

3/4

Statutory elements

Stated position
1/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Own PFAS webpage, 2025 CCR advisory, OCWD fact sheet and quarterly updates identified; no express position on countywide finding. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

recommendation · city-of-huntington-beach-r2

Recommendation R2

County: UnclearAudit: Addressed

Response says

Describes OCWD monitoring, pilots and cost-share policy but no specific city treatment implementation date.

Audit analysis

Describes OCWD monitoring, pilots and cost-share policy but no specific city treatment implementation date. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF pages 3–4. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: Continue stated OCWD-linked PFAS monitoring program, including cited UCMR3/5 and DDW orders; OCWD policy funds 100% design/construction and 50% eligible O&M where described. No universal local treatment-completion date inferred. Source status: claimed-ongoing; not independently verified.

Responsible party
City of Huntington Beach
Timing
No timeframe stated

recommendation · city-of-huntington-beach-r4

Recommendation R4

County: UnclearAudit: Addressed

Response says

Claims advisory/compliance information also online; facility-status coverage not specified.

Audit analysis

Claims advisory/compliance information also online; facility-status coverage not specified. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 4. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: CCR and website PFAS advisory/compliance information. Source status: claimed-completed; not independently verified.

Responsible party
City of Huntington Beach
Timing
No timeframe stated

recommendation · city-of-huntington-beach-r5

Recommendation R5

County: UnclearAudit: Addressed

Response says

Website/CCR/OCWD references plus Surf City Nights and Citizens Academy outreach.

Audit analysis

Website/CCR/OCWD references plus Surf City Nights and Citizens Academy outreach. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 4. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: Continue website/CCR information and OCWD references; Surf City Nights/Citizens Academy outreach. Source status: claimed-ongoing; not independently verified.

Responsible party
City of Huntington Beach
Timing
No timeframe stated

finding · mesa-water-district-f2

Finding F2

Audit: Addressed

Response says

Express reporting position qualified by reportable detection levels set by DDW/federal agencies.

Audit analysis

Express reporting position qualified by reportable detection levels set by DDW/federal agencies. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Express reporting position qualified by reportable detection levels set by DDW/federal agencies. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · mesa-water-district-f4

Finding F4

Audit: Addressed

Response says

Bare agreement.

Audit analysis

Bare agreement. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

4/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

0/6

Public usefulness

Coverage
0/2
Reason specificity
0/2
Support traceability
0/2

Bare agreement. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · mesa-water-district-f6

Finding F6

Audit: Partially addressed

Response says

Affirms both propositions only for own supply and cites over 30,000 tests annually; agreement implied, not labeled.

Audit analysis

Affirms both propositions only for own supply and cites over 30,000 tests annually; agreement implied, not labeled. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

8/10

3/4

Statutory elements

Stated position
1/2
Applicable disagreement elements
2/2

5/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
1/2

Affirms both propositions only for own supply and cites over 30,000 tests annually; agreement implied, not labeled. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · mesa-water-district-f8

Finding F8

Audit: Addressed

Response says

Concurrence limited to regional education lead; describes staff/customer opportunities but not limited-online or 55% propositions.

Audit analysis

Concurrence limited to regional education lead; describes staff/customer opportunities but not limited-online or 55% propositions. Physical report PDF page 36; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

7/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

3/6

Public usefulness

Coverage
1/2
Reason specificity
1/2
Support traceability
1/2

Concurrence limited to regional education lead; describes staff/customer opportunities but not limited-online or 55% propositions. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

recommendation · mesa-water-district-r2

Recommendation R2

County: UnclearAudit: Partially addressed

Response says

Monitoring collaboration and DDW response if applicable standards exceeded; no specific treatment trigger/timeline commitment.

Audit analysis

Monitoring collaboration and DDW response if applicable standards exceeded; no specific treatment trigger/timeline commitment. Explicit assent/general principle alone does not supply an implementation disposition or sufficient action detail. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: Collect PFAS monitoring samples with OCWD and work with DDW if applicable standards exceeded. Conditions/limits: No reportable source detections claimed; no new treatment milestone stated. Source status: claimed-ongoing; not independently verified.

Responsible party
Mesa Water District
Timing
No timeframe stated

recommendation · mesa-water-district-r4

Recommendation R4

County: UnclearAudit: Partially addressed

Response says

General principle only, no disposition/action for advisory, facilities status or CCR/website recommendation.

Audit analysis

General principle only, no disposition/action for advisory, facilities status or CCR/website recommendation. Explicit assent/general principle alone does not supply an implementation disposition or sufficient action detail. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

recommendation · mesa-water-district-r5

Recommendation R5

County: UnclearAudit: Partially addressed

Response says

General continued coordinated outreach, no discrete new action or timeframe.

Audit analysis

General continued coordinated outreach, no discrete new action or timeframe. Explicit assent/general principle alone does not supply an implementation disposition or sufficient action detail. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

finding · city-of-orange-f2

Finding F2

Audit: Addressed

Response says

Describes widespread detections, reporting from 2027 and own current CCR test results.

Audit analysis

Describes widespread detections, reporting from 2027 and own current CCR test results. Physical report PDF page 36; selected response PDF page 1. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Describes widespread detections, reporting from 2027 and own current CCR test results. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-orange-f4

Finding F4

Audit: Addressed

Response says

Identifies OCWD 100% design/construction and 50/50 O&M policy enabling city facilities.

Audit analysis

Identifies OCWD 100% design/construction and 50/50 O&M policy enabling city facilities. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Identifies OCWD 100% design/construction and 50/50 O&M policy enabling city facilities. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-orange-f6

Finding F6

Audit: Addressed

Response says

Scopes to city deliveries, continuous monitoring and thousands of annual service-area tests; no dataset identified.

Audit analysis

Scopes to city deliveries, continuous monitoring and thousands of annual service-area tests; no dataset identified. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

9/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

5/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
1/2

Scopes to city deliveries, continuous monitoring and thousands of annual service-area tests; no dataset identified. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-orange-f8

Finding F8

Audit: Addressed

Response says

Specifies own education efforts, 2025 CCR test data/sampling dates/levels, online publication, utility-bill and newspaper notices.

Audit analysis

Specifies own education efforts, 2025 CCR test data/sampling dates/levels, online publication, utility-bill and newspaper notices. Physical report PDF page 36; selected response PDF pages 2–3. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Specifies own education efforts, 2025 CCR test data/sampling dates/levels, online publication, utility-bill and newspaper notices. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

recommendation · city-of-orange-r2

Recommendation R2

County: ImplementedAudit: Addressed

Response says

Eight treated operating wells; four more wells at three locations in design, construction early 2027; exceeded wells removed until treated.

Audit analysis

Eight treated operating wells; four more wells at three locations in design, construction early 2027; exceeded wells removed until treated. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent describes: Eight treated operating groundwater wells; four additional wells at three locations in design with construction early 2027 and completion by July 1, 2029. Conditions/limits: Exceeding wells removed from operation until treatment. Source status: partially-implemented; not independently verified.

Responsible party
City of Orange
Timing
2029-07-01 · Exact date

recommendation · city-of-orange-r4

Recommendation R4

County: ImplementedAudit: Addressed

Response says

Advisories only when legally defined detections require them; compliance information CCR/website. Says in-service wells will have operational treatment, not unqualified advisory every year.

Audit analysis

Advisories only when legally defined detections require them; compliance information CCR/website. Says in-service wells will have operational treatment, not unqualified advisory every year. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent describes: CCR/website appropriate advisory and compliance information by July 1, 2029. Conditions/limits: Advisory only when required by legally defined PFAS detection; not unconditional annual advisory. Source status: future; not independently verified.

Responsible party
City of Orange
Timing
2029-07-01 · Exact date

recommendation · city-of-orange-r5

Recommendation R5

County: ImplementedAudit: Addressed

Response says

Continued social media, tours, community events and student engagement; no completion date supplied.

Audit analysis

Continued social media, tours, community events and student engagement; no completion date supplied. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: Continue social media, tours, community events and student engagement on drinking-water safety. Source status: claimed-ongoing; not independently verified.

Responsible party
City of Orange
Timing
No timeframe stated

finding · orange-county-executive-office-f3-orange-county-board-of-supervisors

Finding F3

Audit: Addressed

Response says

Aligns association statement with CDC/CDPH, without identifying a particular study or record.

Audit analysis

Aligns association statement with CDC/CDPH, without identifying a particular study or record. Physical report PDF page 36; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

8/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

4/6

Public usefulness

Coverage
2/2
Reason specificity
1/2
Support traceability
1/2

Aligns association statement with CDC/CDPH, without identifying a particular study or record. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

recommendation · orange-county-executive-office-r3-orange-county-board-of-supervisors

Recommendation R3

County: ImplementedAudit: Addressed

Response says

HCA has communicated with OCWD and agreed to collaborate on updating/posting public educational materials; County cannot direct OCWD.

Audit analysis

HCA has communicated with OCWD and agreed to collaborate on updating/posting public educational materials; County cannot direct OCWD. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

finding · orange-county-executive-office-f3-orange-county-health-care-agency

Finding F3

Audit: Addressed

Response says

Aligns association statement with CDC/CDPH, without identifying a particular study or record.

Audit analysis

Aligns association statement with CDC/CDPH, without identifying a particular study or record. Physical report PDF page 36; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

8/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

4/6

Public usefulness

Coverage
2/2
Reason specificity
1/2
Support traceability
1/2

Aligns association statement with CDC/CDPH, without identifying a particular study or record. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

recommendation · orange-county-executive-office-r3-orange-county-health-care-agency

Recommendation R3

County: ImplementedAudit: Addressed

Response says

HCA has communicated with OCWD and agreed to collaborate on updating/posting public educational materials; County cannot direct OCWD.

Audit analysis

HCA has communicated with OCWD and agreed to collaborate on updating/posting public educational materials; County cannot direct OCWD. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: HCA has communicated and agreed with OCWD to collaborate on updating/posting public educational materials. Conditions/limits: County cannot direct OCWD; agreement is not verification materials posted. Source status: claimed-implemented-agreement; not independently verified.

Responsible party
Orange County Health Care Agency, collaborating with Orange County Water District
Timing
No timeframe stated

finding · city-of-buena-park-f2

Finding F2

Audit: Addressed

Response says

Reporting only above state detection level; cites DDW requirements, limiting reporting proposition.

Audit analysis

Reporting only above state detection level; cites DDW requirements, limiting reporting proposition. Physical report PDF page 36; selected response PDF page 1. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Reporting only above state detection level; cites DDW requirements, limiting reporting proposition. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-buena-park-f4

Finding F4

Audit: Addressed

Response says

Describes OCWD work and over 100/200 impacted wells; only Seal Beach/La Palma continued non-detects assertion concerns producer history.

Audit analysis

Describes OCWD work and over 100/200 impacted wells; only Seal Beach/La Palma continued non-detects assertion concerns producer history. Physical report PDF page 36; selected response PDF page 1. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

9/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

5/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
1/2

Describes OCWD work and over 100/200 impacted wells; only Seal Beach/La Palma continued non-detects assertion concerns producer history. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-buena-park-f6

Finding F6

Audit: Addressed

Response says

Restates agreement without additional explanation or support.

Audit analysis

Restates agreement without additional explanation or support. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

4/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

0/6

Public usefulness

Coverage
0/2
Reason specificity
0/2
Support traceability
0/2

Restates agreement without additional explanation or support. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-buena-park-f8

Finding F8

Audit: Partially addressed

Response says

Identifies OCWD fact sheet/quarterly update and agency-specific materials on request; disputed portion remains incompletely specified.

Audit analysis

Identifies OCWD fact sheet/quarterly update and agency-specific materials on request; disputed portion remains incompletely specified. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

7/10

3/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
1/2

4/6

Public usefulness

Coverage
1/2
Reason specificity
1/2
Support traceability
2/2

Identifies OCWD fact sheet/quarterly update and agency-specific materials on request; disputed portion remains incompletely specified. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

recommendation · city-of-buena-park-r2

Recommendation R2

County: ImplementedAudit: Addressed

Response says

Describes joint monitoring, UCMR3/5, orders and OCWD cost-share policy; no local new project deadline.

Audit analysis

Describes joint monitoring, UCMR3/5, orders and OCWD cost-share policy; no local new project deadline. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF pages 2–3. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: Continue stated OCWD-linked PFAS monitoring program, including cited UCMR3/5 and DDW orders; OCWD policy funds 100% design/construction and 50% eligible O&M where described. No universal local treatment-completion date inferred. Source status: claimed-ongoing; not independently verified.

Responsible party
City of Buena Park
Timing
No timeframe stated

recommendation · city-of-buena-park-r4

Recommendation R4

County: Will be implementedAudit: Addressed

Response says

Accepts full R4 with deadline, no additional implementation detail.

Audit analysis

Accepts full R4 with deadline, no additional implementation detail. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent describes: Implement full R4 CCR/website advisory, status and compliance content. Source status: future; not independently verified.

Responsible party
City of Buena Park
Timing
2029-07-01 · Exact date

recommendation · city-of-buena-park-r5

Recommendation R5

County: Will be implementedAudit: Addressed

Response says

Will explore additional marketing methods such as website/bill inserts with OCWD; September 20 not report September 30.

Audit analysis

Will explore additional marketing methods such as website/bill inserts with OCWD; September 20 not report September 30. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent describes: Explore additional marketing methods such as website and water-bill inserts with OCWD. Source status: future; not independently verified.

Responsible party
City of Buena Park
Timing
2026-09-20 · Exact date

finding · orange-county-water-district-f1

Finding F1

Audit: Partially addressed

Response says

Describes manufacturers 3M/Dupont, settlements and $78 million received; position implied rather than explicit agreement/disagreement.

Audit analysis

Describes manufacturers 3M/Dupont, settlements and $78 million received; position implied rather than explicit agreement/disagreement. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

9/10

3/4

Statutory elements

Stated position
1/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Describes manufacturers 3M/Dupont, settlements and $78 million received; position implied rather than explicit agreement/disagreement. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · orange-county-water-district-f2

Finding F2

Audit: Addressed

Response says

Reporting concurrence only above state Report Detection Level under DDW requirements.

Audit analysis

Reporting concurrence only above state Report Detection Level under DDW requirements. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Reporting concurrence only above state Report Detection Level under DDW requirements. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · orange-county-water-district-f3

Finding F3

Audit: Partially addressed

Response says

Association accepted with threshold qualification but position not expressly labeled and studies unnamed.

Audit analysis

Association accepted with threshold qualification but position not expressly labeled and studies unnamed. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

6/10

3/4

Statutory elements

Stated position
1/2
Applicable disagreement elements
2/2

3/6

Public usefulness

Coverage
2/2
Reason specificity
1/2
Support traceability
0/2

Association accepted with threshold qualification but position not expressly labeled and studies unnamed. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · orange-county-water-district-f4

Finding F4

Audit: Partially addressed

Response says

Implies positive role; cites over 100/200 impacted wells and only Seal Beach/La Palma continued non-detects, not direct formal position.

Audit analysis

Implies positive role; cites over 100/200 impacted wells and only Seal Beach/La Palma continued non-detects, not direct formal position. Physical report PDF page 36; selected response PDF pages 2–3. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

8/10

3/4

Statutory elements

Stated position
1/2
Applicable disagreement elements
2/2

5/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
1/2

Implies positive role; cites over 100/200 impacted wells and only Seal Beach/La Palma continued non-detects, not direct formal position. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · orange-county-water-district-f5

Finding F5

Audit: Addressed

Response says

Scopes to impacted wells; estimates over $600 million capital and $1.8 billion total over next 30 years, estimates not expenditures verified.

Audit analysis

Scopes to impacted wells; estimates over $600 million capital and $1.8 billion total over next 30 years, estimates not expenditures verified. Physical report PDF page 36; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

9/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

5/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
1/2

Scopes to impacted wells; estimates over $600 million capital and $1.8 billion total over next 30 years, estimates not expenditures verified. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · orange-county-water-district-f6

Finding F6

Audit: Addressed

Response says

Bare agreement.

Audit analysis

Bare agreement. Physical report PDF page 36; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

4/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

0/6

Public usefulness

Coverage
0/2
Reason specificity
0/2
Support traceability
0/2

Bare agreement. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · orange-county-water-district-f7

Finding F7

Audit: Addressed

Response says

Bare agreement.

Audit analysis

Bare agreement. Physical report PDF page 36; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

4/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

0/6

Public usefulness

Coverage
0/2
Reason specificity
0/2
Support traceability
0/2

Bare agreement. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · orange-county-water-district-f8

Finding F8

Audit: Partially addressed

Response says

Identifies fact sheet, quarterly update and producer-specific materials on request; no explicit position on retailer-wide limitation or 55% estimate.

Audit analysis

Identifies fact sheet, quarterly update and producer-specific materials on request; no explicit position on retailer-wide limitation or 55% estimate. Physical report PDF page 36; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

9/10

3/4

Statutory elements

Stated position
1/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Identifies fact sheet, quarterly update and producer-specific materials on request; no explicit position on retailer-wide limitation or 55% estimate. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

recommendation · orange-county-water-district-r1

Recommendation R1

County: UnclearAudit: Addressed

Response says

Settlements with $78 million received and future receipts/settlements expected; no fresh deadline or agency coordination specified.

Audit analysis

Settlements with $78 million received and future receipts/settlements expected; no fresh deadline or agency coordination specified. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 4. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: Sued PFAS manufacturers; settlements reached and $78 million received with additional payments/settlements expected. Conditions/limits: Expected future settlements not guaranteed recovery. Source status: claimed-completed; not independently verified.

Responsible party
Orange County Water District
Timing
No timeframe stated

recommendation · orange-county-water-district-r2

Recommendation R2

County: UnclearAudit: Addressed

Response says

Basin/Santa Ana watershed monitoring UCMR3/5 and orders, pilot tests, initial-monitoring assurance and 100% capital/50% O&M policy.

Audit analysis

Basin/Santa Ana watershed monitoring UCMR3/5 and orders, pilot tests, initial-monitoring assurance and 100% capital/50% O&M policy. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 4. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: Continue stated OCWD-linked PFAS monitoring program, including cited UCMR3/5 and DDW orders; OCWD policy funds 100% design/construction and 50% eligible O&M where described. No universal local treatment-completion date inferred. Source status: claimed-ongoing; not independently verified.

Responsible party
Orange County Water District
Timing
No timeframe stated

recommendation · orange-county-water-district-r3

Recommendation R3

County: UnclearAudit: Addressed

Response says

Names scientific/regulatory updates via website, social media, Quarterly PFAS Updates and Hydrospectives; does not specifically mention HCA collaboration here.

Audit analysis

Names scientific/regulatory updates via website, social media, Quarterly PFAS Updates and Hydrospectives; does not specifically mention HCA collaboration here. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 5. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: Continue scientific/regulatory/treatment updates through website/social media, Quarterly PFAS Updates and Hydrospectives. Source status: claimed-ongoing; not independently verified.

Responsible party
Orange County Water District
Timing
No timeframe stated

recommendation · orange-county-water-district-r4

Recommendation R4

County: UnclearAudit: Addressed

Response says

Volunteered response beyond required OCWD R list; bare concurrence no implementation disposition.

Audit analysis

Volunteered response beyond required OCWD R list; bare concurrence no implementation disposition. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 5. Engagement is not independent factual, legal or implementation verification.

recommendation · orange-county-water-district-r5

Recommendation R5

County: UnclearAudit: Addressed

Response says

Website and monthly newsletter actions continuing; no new dated enhancement specified.

Audit analysis

Website and monthly newsletter actions continuing; no new dated enhancement specified. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 5. Engagement is not independent factual, legal or implementation verification.

recommendation · orange-county-water-district-r6

Recommendation R6

County: UnclearAudit: Addressed

Response says

Local/national/international agencies on treatment strategies, research and technologies/compliance; no specific integration milestone.

Audit analysis

Local/national/international agencies on treatment strategies, research and technologies/compliance; no specific integration milestone. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 5. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: Continue information sharing with local/national/international water agencies on treatment research/technologies/compliance. Source status: claimed-ongoing; not independently verified.

Responsible party
Orange County Water District
Timing
No timeframe stated

finding · emerald-bay-water-district-f2

Finding F2

Audit: Addressed

Response says

Bare agreement in resolution.

Audit analysis

Bare agreement in resolution. Physical report PDF page 36; selected response PDF pages 2–3. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

4/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

0/6

Public usefulness

Coverage
0/2
Reason specificity
0/2
Support traceability
0/2

Bare agreement in resolution. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · emerald-bay-water-district-f6

Finding F6

Audit: Addressed

Response says

Bare agreement in resolution.

Audit analysis

Bare agreement in resolution. Physical report PDF page 36; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

4/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

0/6

Public usefulness

Coverage
0/2
Reason specificity
0/2
Support traceability
0/2

Bare agreement in resolution. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · emerald-bay-water-district-f8

Finding F8

Audit: Addressed

Response says

Bare agreement in resolution.

Audit analysis

Bare agreement in resolution. Physical report PDF page 36; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

4/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

0/6

Public usefulness

Coverage
0/2
Reason specificity
0/2
Support traceability
0/2

Bare agreement in resolution. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

recommendation · emerald-bay-water-district-r4

Recommendation R4

County: Will be implementedAudit: Addressed

Response says

Work with LBCWD on CCR advisory/compliance/treatment information and EBSD web links before July 1, 2029.

Audit analysis

Work with LBCWD on CCR advisory/compliance/treatment information and EBSD web links before July 1, 2029. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent describes: Work with LBCWD on CCR advisory/compliance/treatment detail and EBSD web links. Conditions/limits: 100% LBCWD purchased supply; no own wells or upstream process control. Source status: future; not independently verified.

Responsible party
Emerald Bay Service District
Timing
2029-07-01 · Exact date

recommendation · emerald-bay-water-district-r5

Recommendation R5

County: Will be implementedAudit: Addressed

Response says

Coordinate with LBCWD and OCWD where applicable; publish customer communications and website information/links before deadline.

Audit analysis

Coordinate with LBCWD and OCWD where applicable; publish customer communications and website information/links before deadline. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent describes: Publish customer-facing PFAS/safety communications, website updates/links with LBCWD and OCWD where applicable. Source status: future; not independently verified.

Responsible party
Emerald Bay Service District
Timing
2026-09-30 · Exact date

finding · trabuco-canyon-water-district-f2

Finding F2

Audit: Addressed

Response says

Own wells outside OC groundwater basin, reports no PFAS detections; no monitoring record identified.

Audit analysis

Own wells outside OC groundwater basin, reports no PFAS detections; no monitoring record identified. Physical report PDF page 36; selected response PDF page 1. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

8/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

4/6

Public usefulness

Coverage
2/2
Reason specificity
1/2
Support traceability
1/2

Own wells outside OC groundwater basin, reports no PFAS detections; no monitoring record identified. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · trabuco-canyon-water-district-f6

Finding F6

Audit: Addressed

Response says

Bare agreement.

Audit analysis

Bare agreement. Physical report PDF page 36; selected response PDF page 1. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

4/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

0/6

Public usefulness

Coverage
0/2
Reason specificity
0/2
Support traceability
0/2

Bare agreement. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · trabuco-canyon-water-district-f8

Finding F8

Audit: Addressed

Response says

Disputes implied inadequacy, notes non-OCWD service areas and own use of varied outreach resources; resources not specifically named.

Audit analysis

Disputes implied inadequacy, notes non-OCWD service areas and own use of varied outreach resources; resources not specifically named. Physical report PDF page 36; selected response PDF page 1. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

9/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

5/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
1/2

Disputes implied inadequacy, notes non-OCWD service areas and own use of varied outreach resources; resources not specifically named. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

recommendation · trabuco-canyon-water-district-r4

Recommendation R4

County: ImplementedAudit: Addressed

Response says

EPA-compliant CCR with PFAS information, MWDOC-agency cooperation; no detections or PFAS facilities asserted; website not specifically addressed.

Audit analysis

EPA-compliant CCR with PFAS information, MWDOC-agency cooperation; no detections or PFAS facilities asserted; website not specifically addressed. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: Provide PFAS CCR information with MWDOC-served agencies. Conditions/limits: No source detections or PFAS treatment facilities asserted. Source status: claimed-completed; not independently verified.

Responsible party
Trabuco Canyon Water District
Timing
No timeframe stated

recommendation · trabuco-canyon-water-district-r5

Recommendation R5

County: ImplementedAudit: Addressed

Response says

Added CCR PFAS information with MWDOC agencies; urges focus on non-drinking-water pathways and balanced non-alarmist messages.

Audit analysis

Added CCR PFAS information with MWDOC agencies; urges focus on non-drinking-water pathways and balanced non-alarmist messages. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

finding · city-of-fountain-valley-f2

Finding F2

Audit: Addressed

Response says

Reporting qualified by DLR and DDW requirements; explicit detections and reporting response.

Audit analysis

Reporting qualified by DLR and DDW requirements; explicit detections and reporting response. Physical report PDF page 36; selected response PDF page 1. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Reporting qualified by DLR and DDW requirements; explicit detections and reporting response. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-fountain-valley-f4

Finding F4

Audit: Addressed

Response says

Accepts varying methods and implementation, describes over 100/200 impacted wells and producer collaboration.

Audit analysis

Accepts varying methods and implementation, describes over 100/200 impacted wells and producer collaboration. Physical report PDF page 36; selected response PDF pages 1–2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

9/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

5/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
1/2

Accepts varying methods and implementation, describes over 100/200 impacted wells and producer collaboration. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-fountain-valley-f6

Finding F6

Audit: Addressed

Response says

Bare agreement.

Audit analysis

Bare agreement. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

4/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

0/6

Public usefulness

Coverage
0/2
Reason specificity
0/2
Support traceability
0/2

Bare agreement. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-fountain-valley-f8

Finding F8

Audit: Partially addressed

Response says

Details OCWD fact sheet/quarterly updates and need for local engagement; disagreement scope/reason incomplete concerning own actual online programs and 55%.

Audit analysis

Details OCWD fact sheet/quarterly updates and need for local engagement; disagreement scope/reason incomplete concerning own actual online programs and 55%. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

7/10

3/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
1/2

4/6

Public usefulness

Coverage
1/2
Reason specificity
1/2
Support traceability
2/2

Details OCWD fact sheet/quarterly updates and need for local engagement; disagreement scope/reason incomplete concerning own actual online programs and 55%. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

recommendation · city-of-fountain-valley-r2

Recommendation R2

County: ImplementedAudit: Addressed

Response says

Joint monitoring includes UCMR3/5 and DDW orders; initial monitoring assurance; no local treatment milestone.

Audit analysis

Joint monitoring includes UCMR3/5 and DDW orders; initial monitoring assurance; no local treatment milestone. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: Continue stated OCWD-linked PFAS monitoring program, including cited UCMR3/5 and DDW orders; OCWD policy funds 100% design/construction and 50% eligible O&M where described. No universal local treatment-completion date inferred. Source status: claimed-ongoing; not independently verified.

Responsible party
City of Fountain Valley
Timing
No timeframe stated

recommendation · city-of-fountain-valley-r4

Recommendation R4

County: UnclearAudit: Addressed

Response says

Existing compliance metrics in CCR/Public Health Goals reports/hearings; will refine messaging, applicability condition retained.

Audit analysis

Existing compliance metrics in CCR/Public Health Goals reports/hearings; will refine messaging, applicability condition retained. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF pages 2–3. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent describes: Refine CCR/public messaging through July 1, 2029; existing CCR/Public Health Goals metrics/hearings. Conditions/limits: Where applicable; anticipated implementation. Source status: partially-implemented; not independently verified.

Responsible party
City of Fountain Valley
Timing
2029-07-01 · Exact date

recommendation · city-of-fountain-valley-r5

Recommendation R5

County: UnclearAudit: Addressed

Response says

Website graphics, simplified data and OCWD/DDW/EPA links planned by September 30, 2026; countywide campaigns/joint outreach continuing.

Audit analysis

Website graphics, simplified data and OCWD/DDW/EPA links planned by September 30, 2026; countywide campaigns/joint outreach continuing. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent describes: Update website with graphics, simplified data and OCWD/DDW/EPA links; continue joint campaigns/events. Source status: future; not independently verified.

Responsible party
City of Fountain Valley
Timing
2026-09-30 · Exact date

finding · santa-margarita-water-district-f2

Finding F2

Audit: Addressed

Response says

Own monitoring/reporting identified under DW 2022-0001-DDW amended January 2026 and annual CCRs.

Audit analysis

Own monitoring/reporting identified under DW 2022-0001-DDW amended January 2026 and annual CCRs. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Own monitoring/reporting identified under DW 2022-0001-DDW amended January 2026 and annual CCRs. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · santa-margarita-water-district-f6

Finding F6

Audit: Addressed

Response says

Bare agreement limited to own water.

Audit analysis

Bare agreement limited to own water. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

4/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

0/6

Public usefulness

Coverage
0/2
Reason specificity
0/2
Support traceability
0/2

Bare agreement limited to own water. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · santa-margarita-water-district-f8

Finding F8

Audit: Addressed

Response says

Not an OCWD retailer; scopes to own outreach/annual CCR PFAS information and declines speaking for OCWD retailers.

Audit analysis

Not an OCWD retailer; scopes to own outreach/annual CCR PFAS information and declines speaking for OCWD retailers. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

9/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

5/6

Public usefulness

Coverage
2/2
Reason specificity
1/2
Support traceability
2/2

Not an OCWD retailer; scopes to own outreach/annual CCR PFAS information and declines speaking for OCWD retailers. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

recommendation · santa-margarita-water-district-r4

Recommendation R4

County: ImplementedAudit: Addressed

Response says

Claims relevant CCR and website information; no specific facility-status detail.

Audit analysis

Claims relevant CCR and website information; no specific facility-status detail. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF pages 2–3. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: Provide relevant PFAS CCR and website information. Source status: claimed-completed; not independently verified.

Responsible party
Santa Margarita Water District
Timing
No timeframe stated

recommendation · santa-margarita-water-district-r5

Recommendation R5

County: ImplementedAudit: Addressed

Response says

Current outreach/CCR information and continued emerging-constituent education, no discrete expansion.

Audit analysis

Current outreach/CCR information and continued emerging-constituent education, no discrete expansion. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

finding · moulton-niguel-water-district-f2

Finding F2

Audit: Addressed

Response says

Scopes groundwater contamination away from own imported-only supply; reports no detections among 29 UCMR5 PFAS and DDW CCR compliance.

Audit analysis

Scopes groundwater contamination away from own imported-only supply; reports no detections among 29 UCMR5 PFAS and DDW CCR compliance. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Scopes groundwater contamination away from own imported-only supply; reports no detections among 29 UCMR5 PFAS and DDW CCR compliance. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · moulton-niguel-water-district-f6

Finding F6

Audit: Addressed

Response says

Distribution-system monitoring cited generally for own water-quality/safety assertion, no particular record.

Audit analysis

Distribution-system monitoring cited generally for own water-quality/safety assertion, no particular record. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

8/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

4/6

Public usefulness

Coverage
2/2
Reason specificity
1/2
Support traceability
1/2

Distribution-system monitoring cited generally for own water-quality/safety assertion, no particular record. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · moulton-niguel-water-district-f8

Finding F8

Audit: Addressed

Response says

Own annual Water Quality Report and SWRCB resources; expressly does not rely on OCWD, complementary outreach.

Audit analysis

Own annual Water Quality Report and SWRCB resources; expressly does not rely on OCWD, complementary outreach. Physical report PDF page 36; selected response PDF pages 2–3. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Own annual Water Quality Report and SWRCB resources; expressly does not rely on OCWD, complementary outreach. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

recommendation · moulton-niguel-water-district-r4

Recommendation R4

County: Will be implementedAudit: Addressed

Response says

Already CCR non-detect notice online/print; dedicated PFAS website information promised by deadline.

Audit analysis

Already CCR non-detect notice online/print; dedicated PFAS website information promised by deadline. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent describes: Add dedicated PFAS information to website; existing non-detect notice in Water Quality Report online/print. Source status: partially-implemented; not independently verified.

Responsible party
Moulton Niguel Water District
Timing
2029-07-01 · Exact date

recommendation · moulton-niguel-water-district-r5

Recommendation R5

County: Will not be implementedAudit: Addressed

Response says

Declines expansion, enumerates existing online/print/electronic newsletters, bills/envelope message, speakers bureau, email/web/social media; continue coordination as appropriate.

Audit analysis

Declines expansion, enumerates existing online/print/electronic newsletters, bills/envelope message, speakers bureau, email/web/social media; continue coordination as appropriate. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF pages 3–4. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: Maintain listed localized CCR/newsletter/bill/speakers/email/web/social-media education rather than expand it; coordinate as appropriate. Conditions/limits: Expansion explicitly will not be implemented; existing/planned efforts considered sufficient. Source status: claimed-ongoing-with-refusal; not independently verified.

Responsible party
Moulton Niguel Water District
Timing
No timeframe stated

finding · yorba-linda-water-district-f2

Finding F2

Audit: Addressed

Response says

Reporting qualified by state Report Detection Level/DDW requirements.

Audit analysis

Reporting qualified by state Report Detection Level/DDW requirements. Physical report PDF page 36; selected response PDF page 1. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Reporting qualified by state Report Detection Level/DDW requirements. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · yorba-linda-water-district-f4

Finding F4

Audit: Addressed

Response says

Describes joint PFAS removal before distribution and own compliance/safety, no specific record cited here.

Audit analysis

Describes joint PFAS removal before distribution and own compliance/safety, no specific record cited here. Physical report PDF page 36; selected response PDF pages 1–2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

9/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

5/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
1/2

Describes joint PFAS removal before distribution and own compliance/safety, no specific record cited here. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · yorba-linda-water-district-f6

Finding F6

Audit: Addressed

Response says

Bare agreement limited to own service area.

Audit analysis

Bare agreement limited to own service area. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

4/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

0/6

Public usefulness

Coverage
0/2
Reason specificity
0/2
Support traceability
0/2

Bare agreement limited to own service area. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · yorba-linda-water-district-f8

Finding F8

Audit: Addressed

Response says

Own online CCR dedicated treatment section and OCWD fact sheet/quarterly-update link; disagreement scoped to own agency.

Audit analysis

Own online CCR dedicated treatment section and OCWD fact sheet/quarterly-update link; disagreement scoped to own agency. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Own online CCR dedicated treatment section and OCWD fact sheet/quarterly-update link; disagreement scoped to own agency. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

recommendation · yorba-linda-water-district-r2

Recommendation R2

County: UnclearAudit: Addressed

Response says

Joint UCMR/orders monitoring; OCWD pilot at YLWD headquarters and treatment for all groundwater with cost-share policy.

Audit analysis

Joint UCMR/orders monitoring; OCWD pilot at YLWD headquarters and treatment for all groundwater with cost-share policy. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: Continue stated OCWD-linked PFAS monitoring program, including cited UCMR3/5 and DDW orders; OCWD policy funds 100% design/construction and 50% eligible O&M where described. No universal local treatment-completion date inferred. Source status: claimed-ongoing; not independently verified.

Responsible party
Yorba Linda Water District
Timing
No timeframe stated

Respondent reports: Treat all service-area groundwater; pilot program at headquarters. Source status: claimed-completed; not independently verified.

Responsible party
Yorba Linda Water District
Timing
No timeframe stated

recommendation · yorba-linda-water-district-r4

Recommendation R4

County: UnclearAudit: Partially addressed

Response says

Bare agreement, no implementation status or action.

Audit analysis

Bare agreement, no implementation status or action. Explicit assent/general principle alone does not supply an implementation disposition or sufficient action detail. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

recommendation · yorba-linda-water-district-r5

Recommendation R5

County: UnclearAudit: Addressed

Response says

Existing treatment tours, annual open house, recurring outreach/publications; continued education.

Audit analysis

Existing treatment tours, annual open house, recurring outreach/publications; continued education. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: Continue treatment tours, annual open house, recurring events and district publications. Source status: claimed-ongoing; not independently verified.

Responsible party
Yorba Linda Water District
Timing
No timeframe stated

finding · city-of-anaheim-f2

Finding F2

Audit: Addressed

Response says

Discusses industrial/product/food PFAS and groundwater treatment/CCR education; own programs described since 2019.

Audit analysis

Discusses industrial/product/food PFAS and groundwater treatment/CCR education; own programs described since 2019. Physical report PDF page 36; selected response PDF pages 1–2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Discusses industrial/product/food PFAS and groundwater treatment/CCR education; own programs described since 2019. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-anaheim-f4

Finding F4

Audit: Addressed

Response says

Describes coordinated program and reimbursement agreement/federal-state funding basis.

Audit analysis

Describes coordinated program and reimbursement agreement/federal-state funding basis. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Describes coordinated program and reimbursement agreement/federal-state funding basis. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-anaheim-f6

Finding F6

Audit: Addressed

Response says

Own 80% groundwater supply and treatment/cost recovery program since 2019 supports explanation, no independent verification.

Audit analysis

Own 80% groundwater supply and treatment/cost recovery program since 2019 supports explanation, no independent verification. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Own 80% groundwater supply and treatment/cost recovery program since 2019 supports explanation, no independent verification. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-anaheim-f8

Finding F8

Audit: Addressed

Response says

Declines speaking for other retailers; enumerates own PFAS pages since 2019, meetings, tours/events, CCR, bills/social media and URLs.

Audit analysis

Declines speaking for other retailers; enumerates own PFAS pages since 2019, meetings, tours/events, CCR, bills/social media and URLs. Physical report PDF page 36; selected response PDF pages 2–3. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Declines speaking for other retailers; enumerates own PFAS pages since 2019, meetings, tours/events, CCR, bills/social media and URLs. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

recommendation · city-of-anaheim-r2

Recommendation R2

County: ImplementedAudit: Addressed

Response says

Nine operating sites/14 wells Phases A/B; four wells at four locations rehabilitating; Phase C design, construction late 2026, operation by July 1, 2029.

Audit analysis

Nine operating sites/14 wells Phases A/B; four wells at four locations rehabilitating; Phase C design, construction late 2026, operation by July 1, 2029. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF pages 3–4. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent describes: Nine operational treatment locations/14 wells Phases A/B; four wells/four locations rehabilitating and Phase C construction late 2026, operational by July 1, 2029. Source status: partially-implemented; not independently verified.

Responsible party
City of Anaheim
Timing
2029-07-01 · Exact date

recommendation · city-of-anaheim-r4

Recommendation R4

County: Will be implementedAudit: Addressed

Response says

Will add recommended topics to CCR and website; earlier deadline than report July 2029.

Audit analysis

Will add recommended topics to CCR and website; earlier deadline than report July 2029. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 4. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent describes: Incorporate recommended advisory/status/compliance topics in CCR and website. Source status: partially-implemented; not independently verified.

Responsible party
City of Anaheim
Timing
2027-07-01 · Exact date

recommendation · city-of-anaheim-r5

Recommendation R5

County: ImplementedAudit: Addressed

Response says

Existing F8 programs; continue in-person events, tours, student engagement, information and social media.

Audit analysis

Existing F8 programs; continue in-person events, tours, student engagement, information and social media. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 4. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: Continue described community events/tours/student engagement/public information/social media. Source status: claimed-ongoing; not independently verified.

Responsible party
City of Anaheim
Timing
No timeframe stated

finding · city-of-garden-grove-f2

Finding F2

Audit: Addressed

Response says

Identifies current CCR results at ggcity.org/ccr; limited additional explanation.

Audit analysis

Identifies current CCR results at ggcity.org/ccr; limited additional explanation. Physical report PDF page 36; selected response PDF page 1. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

9/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

5/6

Public usefulness

Coverage
2/2
Reason specificity
1/2
Support traceability
2/2

Identifies current CCR results at ggcity.org/ccr; limited additional explanation. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-garden-grove-f4

Finding F4

Audit: Addressed

Response says

Pilot studies, facilities and manufacturer litigation described; no specific record citation.

Audit analysis

Pilot studies, facilities and manufacturer litigation described; no specific record citation. Physical report PDF page 36; selected response PDF page 1. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

9/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

5/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
1/2

Pilot studies, facilities and manufacturer litigation described; no specific record citation. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-garden-grove-f6

Finding F6

Audit: Addressed

Response says

Explains regulatory condition for supplying customers and joint routine testing, no dataset identified.

Audit analysis

Explains regulatory condition for supplying customers and joint routine testing, no dataset identified. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

8/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

4/6

Public usefulness

Coverage
2/2
Reason specificity
1/2
Support traceability
1/2

Explains regulatory condition for supplying customers and joint routine testing, no dataset identified. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-garden-grove-f8

Finding F8

Audit: Addressed

Response says

Own CCR advisories among 55% with specific CCR URL.

Audit analysis

Own CCR advisories among 55% with specific CCR URL. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Own CCR advisories among 55% with specific CCR URL. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

recommendation · city-of-garden-grove-r2

Recommendation R2

County: ImplementedAudit: Partially addressed

Response says

Implementation claim with year only, no action summary.

Audit analysis

Implementation claim with year only, no action summary. Explicit assent/general principle alone does not supply an implementation disposition or sufficient action detail. Physical report PDF page 37; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

recommendation · city-of-garden-grove-r4

Recommendation R4

County: ImplementedAudit: Addressed

Response says

Identifies water-quality webpage/CCR URLs; no separate facilities-status detail.

Audit analysis

Identifies water-quality webpage/CCR URLs; no separate facilities-status detail. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: Maintain PFAS water-quality webpage and CCR information at identified URLs. Source status: claimed-completed; not independently verified.

Responsible party
City of Garden Grove
Timing
No timeframe stated

recommendation · city-of-garden-grove-r5

Recommendation R5

County: ImplementedAudit: Addressed

Response says

CCR, city website/social media and direct inquiry responses continuing.

Audit analysis

CCR, city website/social media and direct inquiry responses continuing. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF pages 2–3. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: Continue CCR, website, social media and responses to inquiries with OCWD. Source status: claimed-ongoing; not independently verified.

Responsible party
City of Garden Grove
Timing
No timeframe stated

finding · city-of-seal-beach-f2

Finding F2

Audit: Addressed

Response says

Bare agreement.

Audit analysis

Bare agreement. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

4/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

0/6

Public usefulness

Coverage
0/2
Reason specificity
0/2
Support traceability
0/2

Bare agreement. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-seal-beach-f4

Finding F4

Audit: Addressed

Response says

Bare agreement.

Audit analysis

Bare agreement. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

4/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

0/6

Public usefulness

Coverage
0/2
Reason specificity
0/2
Support traceability
0/2

Bare agreement. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-seal-beach-f6

Finding F6

Audit: Addressed

Response says

Bare agreement.

Audit analysis

Bare agreement. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

4/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

0/6

Public usefulness

Coverage
0/2
Reason specificity
0/2
Support traceability
0/2

Bare agreement. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-seal-beach-f8

Finding F8

Audit: Addressed

Response says

Expressly has not verified 55%; identifies report as basis, supports coordinated education without local program detail.

Audit analysis

Expressly has not verified 55%; identifies report as basis, supports coordinated education without local program detail. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

9/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

5/6

Public usefulness

Coverage
2/2
Reason specificity
1/2
Support traceability
2/2

Expressly has not verified 55%; identifies report as basis, supports coordinated education without local program detail. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

recommendation · city-of-seal-beach-r2

Recommendation R2

County: ImplementedAudit: Addressed

Response says

OCWD monitors for members; no surface-water source facilities. Exceedance prompts evaluation/appropriate actions, not necessarily treatment alone.

Audit analysis

OCWD monitors for members; no surface-water source facilities. Exceedance prompts evaluation/appropriate actions, not necessarily treatment alone. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF pages 2–3. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Conditional offer: Evaluate and implement appropriate response actions if source exceeds applicable PFAS response levels/thresholds. Conditions/limits: No city surface-water source facilities; OCWD monitors groundwater. Not unconditional promise treatment only. Source status: conditional-future; not independently verified.

Responsible party
City of Seal Beach
Timing
No city surface-water source facilities; OCWD monitors groundwater. Not unconditional promise treatment only. · Conditional timing

recommendation · city-of-seal-beach-r4

Recommendation R4

County: Will be implementedAudit: Addressed

Response says

Required CCR information; no detections requiring treatment, facilities status inapplicable now. Advisories/website conditional on results, rules and OCWD coordination; no specific date adopted.

Audit analysis

Required CCR information; no detections requiring treatment, facilities status inapplicable now. Advisories/website conditional on results, rules and OCWD coordination; no specific date adopted. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent describes: Provide required CCR information and PFAS-related advisory/compliance/website updates as applicable. Conditions/limits: Future monitoring/regulatory requirements/OCWD coordination; facilities currently inapplicable; no firm date. Source status: partial-future; not independently verified.

Responsible party
City of Seal Beach
Timing
No timeframe stated

recommendation · city-of-seal-beach-r5

Recommendation R5

County: UnclearAudit: Addressed

Response says

Future coordination on collectively agreeable date, existing channels and avoidance of duplication/resource impacts; not September 30 promise.

Audit analysis

Future coordination on collectively agreeable date, existing channels and avoidance of duplication/resource impacts; not September 30 promise. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent describes: Coordinate future public education using existing website/report/customer-service channels. Conditions/limits: Collectively agreeable date not specified; avoid duplication and undue resource impacts. Source status: future; not independently verified.

Responsible party
City of Seal Beach
Timing
No timeframe stated

finding · city-of-tustin-f2

Finding F2

Audit: Addressed

Response says

Explains report detection threshold and DDW requirements.

Audit analysis

Explains report detection threshold and DDW requirements. Physical report PDF page 36; selected response PDF page 1. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Explains report detection threshold and DDW requirements. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-tustin-f4

Finding F4

Audit: Addressed

Response says

Bare agreement.

Audit analysis

Bare agreement. Physical report PDF page 36; selected response PDF page 1. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

4/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

0/6

Public usefulness

Coverage
0/2
Reason specificity
0/2
Support traceability
0/2

Bare agreement. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-tustin-f6

Finding F6

Audit: Addressed

Response says

Bare agreement.

Audit analysis

Bare agreement. Physical report PDF page 36; selected response PDF page 1. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

4/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

0/6

Public usefulness

Coverage
0/2
Reason specificity
0/2
Support traceability
0/2

Bare agreement. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-tustin-f8

Finding F8

Audit: Addressed

Response says

Own Understanding-PFAS webpage URL and Tustin-specific sheets with OCWD support, scoped own outreach.

Audit analysis

Own Understanding-PFAS webpage URL and Tustin-specific sheets with OCWD support, scoped own outreach. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Own Understanding-PFAS webpage URL and Tustin-specific sheets with OCWD support, scoped own outreach. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

recommendation · city-of-tustin-r2

Recommendation R2

County: ImplementedAudit: Addressed

Response says

OCWD monitoring, UCMR3/5/orders, pilots and capital/O&M policy described; no local completion schedule.

Audit analysis

OCWD monitoring, UCMR3/5/orders, pilots and capital/O&M policy described; no local completion schedule. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: Continue stated OCWD-linked PFAS monitoring program, including cited UCMR3/5 and DDW orders; OCWD policy funds 100% design/construction and 50% eligible O&M where described. No universal local treatment-completion date inferred. Source status: claimed-ongoing; not independently verified.

Responsible party
City of Tustin
Timing
No timeframe stated

recommendation · city-of-tustin-r4

Recommendation R4

County: Requires further analysisAudit: Partially addressed

Response says

Will continue CCR compliance and update website PFAS/facilities information; no analysis scope or timeframe.

Audit analysis

Will continue CCR compliance and update website PFAS/facilities information; no analysis scope or timeframe. Explicit assent/general principle alone does not supply an implementation disposition or sufficient action detail. Physical report PDF page 37; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent describes: Update city website PFAS/facilities information and continue CCR compliance. Conditions/limits: Requires further analysis; scope/timeframe not supplied. Source status: partial-future; not independently verified.

Responsible party
City of Tustin
Timing
No timeframe stated

recommendation · city-of-tustin-r5

Recommendation R5

County: ImplementedAudit: Addressed

Response says

City/OCWD continuing public website information/resources/updates.

Audit analysis

City/OCWD continuing public website information/resources/updates. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF pages 2–3. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: Continue OCWD-coordinated website PFAS information/resources/updates. Source status: claimed-ongoing; not independently verified.

Responsible party
City of Tustin
Timing
No timeframe stated

finding · city-of-san-clemente-f2

Finding F2

Audit: Addressed

Response says

Accepts county detections but no PFAS detected in own groundwater/imported MWD supply; no dataset identified.

Audit analysis

Accepts county detections but no PFAS detected in own groundwater/imported MWD supply; no dataset identified. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

8/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

4/6

Public usefulness

Coverage
2/2
Reason specificity
1/2
Support traceability
1/2

Accepts county detections but no PFAS detected in own groundwater/imported MWD supply; no dataset identified. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-san-clemente-f6

Finding F6

Audit: Addressed

Response says

Own drinking-water compliance assertion references Annual CCR, no additional home-filtration analysis.

Audit analysis

Own drinking-water compliance assertion references Annual CCR, no additional home-filtration analysis. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

9/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

5/6

Public usefulness

Coverage
2/2
Reason specificity
1/2
Support traceability
2/2

Own drinking-water compliance assertion references Annual CCR, no additional home-filtration analysis. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-san-clemente-f8

Finding F8

Audit: Addressed

Response says

Acknowledges limited own outreach except Annual CCR, relates to claimed own non-detect supply.

Audit analysis

Acknowledges limited own outreach except Annual CCR, relates to claimed own non-detect supply. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Acknowledges limited own outreach except Annual CCR, relates to claimed own non-detect supply. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

recommendation · city-of-san-clemente-r4

Recommendation R4

County: UnclearAudit: Addressed

Response says

Annual CCR information already; more website information by July 1, 2029.

Audit analysis

Annual CCR information already; more website information by July 1, 2029. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent describes: Add more website PFAS information; Annual CCR already has information. Source status: partially-implemented; not independently verified.

Responsible party
City of San Clemente
Timing
2029-07-01 · Exact date

recommendation · city-of-san-clemente-r5

Recommendation R5

County: Will be implementedAudit: Addressed

Response says

Dated commitment to enhanced coordination; no discrete channel or deliverable specified.

Audit analysis

Dated commitment to enhanced coordination; no discrete channel or deliverable specified. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent describes: Enhance coordinated public education. Conditions/limits: No discrete method specified. Source status: future; not independently verified.

Responsible party
City of San Clemente
Timing
2026-09-30 · Exact date

finding · city-of-la-habra-f2

Finding F2

Audit: Addressed

Response says

Agrees widespread/county detections, disputes unconditional reporting: CCRDL threshold under SWRCB/DDW.

Audit analysis

Agrees widespread/county detections, disputes unconditional reporting: CCRDL threshold under SWRCB/DDW. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Agrees widespread/county detections, disputes unconditional reporting: CCRDL threshold under SWRCB/DDW. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-la-habra-f6

Finding F6

Audit: Addressed

Response says

Bare agreement.

Audit analysis

Bare agreement. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

4/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

0/6

Public usefulness

Coverage
0/2
Reason specificity
0/2
Support traceability
0/2

Bare agreement. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-la-habra-f8

Finding F8

Audit: Addressed

Response says

Bare agreement.

Audit analysis

Bare agreement. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

4/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

0/6

Public usefulness

Coverage
0/2
Reason specificity
0/2
Support traceability
0/2

Bare agreement. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

recommendation · city-of-la-habra-r4

Recommendation R4

County: Requires further analysisAudit: Addressed

Response says

Portola quarterly since April 2023, Idaho since June 2026 non-detect; Idaho monitoring through April 2027 to inform whether advisory/status/reporting warranted. No website decision or within-six-month analysis milestone.

Audit analysis

Portola quarterly since April 2023, Idaho since June 2026 non-detect; Idaho monitoring through April 2027 to inform whether advisory/status/reporting warranted. No website decision or within-six-month analysis milestone. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF pages 2–3. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Analysis or consideration, not implementation: Continue quarterly Idaho Well monitoring through April 2027 to complete initial monitoring, then determine advisory/status/reporting need. Conditions/limits: April 2027 supplied as monitoring end, not firm advisory-publication date. Source status: analysis-in-progress; not independently verified.

Responsible party
City of La Habra
Timing
No timeframe stated

recommendation · city-of-la-habra-r5

Recommendation R5

County: ImplementedAudit: Addressed

Response says

Existing La Habra Life newsletter, Life in La Habra magazine and community booths; no specific PFAS coordination described.

Audit analysis

Existing La Habra Life newsletter, Life in La Habra magazine and community booths; no specific PFAS coordination described. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: Maintain La Habra Life newsletter, Life in La Habra magazine and community booths. Conditions/limits: No specific PFAS coordination detailed. Source status: claimed-completed; not independently verified.

Responsible party
City of La Habra
Timing
No timeframe stated

finding · city-of-brea-f2

Finding F2

Audit: Not addressed

Response says

Declines countywide position; explains no potable wells, own CCR compliance, no required own monitoring asserted. No discernible agreement on F2 itself.

Audit analysis

Declines countywide position; explains no potable wells, own CCR compliance, no required own monitoring asserted. No discernible agreement on F2 itself. Physical report PDF page 36; selected response PDF page 1. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

6/10

0/4

Statutory elements

Stated position
0/2
Applicable disagreement elements
0/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Declines countywide position; explains no potable wells, own CCR compliance, no required own monitoring asserted. No discernible agreement on F2 itself. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-brea-f6

Finding F6

Audit: Partially addressed

Response says

Own supply expressly affirmed compliant/safe without filtration, but formal position remains countywide abstention; local concurrence implied.

Audit analysis

Own supply expressly affirmed compliant/safe without filtration, but formal position remains countywide abstention; local concurrence implied. Physical report PDF page 36; selected response PDF page 1. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

6/10

3/4

Statutory elements

Stated position
1/2
Applicable disagreement elements
2/2

3/6

Public usefulness

Coverage
2/2
Reason specificity
1/2
Support traceability
0/2

Own supply expressly affirmed compliant/safe without filtration, but formal position remains countywide abstention; local concurrence implied. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-brea-f8

Finding F8

Audit: Not addressed

Response says

No position on outreach finding; no wells and CCR compliance do not engage adequacy/55% propositions.

Audit analysis

No position on outreach finding; no wells and CCR compliance do not engage adequacy/55% propositions. Physical report PDF page 36; selected response PDF pages 1–2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

2/10

0/4

Statutory elements

Stated position
0/2
Applicable disagreement elements
0/2

2/6

Public usefulness

Coverage
0/2
Reason specificity
1/2
Support traceability
1/2

No position on outreach finding; no wells and CCR compliance do not engage adequacy/55% propositions. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

recommendation · city-of-brea-r4

Recommendation R4

County: Will not be implementedAudit: Addressed

Response says

No potable wells and 100% imported compliant supply; CCR safety reassurance given as reason for refusal.

Audit analysis

No potable wells and 100% imported compliant supply; CCR safety reassurance given as reason for refusal. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

recommendation · city-of-brea-r5

Recommendation R5

County: Will not be implementedAudit: Addressed

Response says

Same imported-only/no-well/compliance rationale; no enhanced coordination commitment.

Audit analysis

Same imported-only/no-well/compliance rationale; no enhanced coordination commitment. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

finding · laguna-beach-water-district-f2

Finding F2

Audit: Addressed

Response says

Applicable reporting requirements accepted; groundwater detections expressly county-level condition, no particular regulation identified.

Audit analysis

Applicable reporting requirements accepted; groundwater detections expressly county-level condition, no particular regulation identified. Physical report PDF page 36; selected response PDF page 1. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

8/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

4/6

Public usefulness

Coverage
2/2
Reason specificity
1/2
Support traceability
1/2

Applicable reporting requirements accepted; groundwater detections expressly county-level condition, no particular regulation identified. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · laguna-beach-water-district-f6

Finding F6

Audit: Addressed

Response says

Bare agreement.

Audit analysis

Bare agreement. Physical report PDF page 36; selected response PDF page 1. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

4/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

0/6

Public usefulness

Coverage
0/2
Reason specificity
0/2
Support traceability
0/2

Bare agreement. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · laguna-beach-water-district-f8

Finding F8

Audit: Addressed

Response says

Only disputes implication own outreach inadequate; relies on OCWD regional program and asserts imported PFAS-free supply, not a test record.

Audit analysis

Only disputes implication own outreach inadequate; relies on OCWD regional program and asserts imported PFAS-free supply, not a test record. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

9/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

5/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
1/2

Only disputes implication own outreach inadequate; relies on OCWD regional program and asserts imported PFAS-free supply, not a test record. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

recommendation · laguna-beach-water-district-r4

Recommendation R4

County: Will be implementedAudit: Addressed

Response says

Accepts complete recommendation with deadline but no additional method.

Audit analysis

Accepts complete recommendation with deadline but no additional method. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent describes: Implement full R4. Source status: future; not independently verified.

Responsible party
Laguna Beach County Water District
Timing
2029-07-01 · Exact date

recommendation · laguna-beach-water-district-r5

Recommendation R5

County: Will be implementedAudit: Addressed

Response says

Continue OCWD/regional partner coordination for PFAS/water-quality education.

Audit analysis

Continue OCWD/regional partner coordination for PFAS/water-quality education. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent describes: Coordinate OCWD/regional education implementation. Source status: future; not independently verified.

Responsible party
Laguna Beach County Water District
Timing
2026-09-30 · Exact date

finding · city-of-newport-beach-f2

Finding F2

Audit: Addressed

Response says

Qualifies reporting by state threshold, claims current no detectable system PFAS and all quarterly results posted on dedicated webpage.

Audit analysis

Qualifies reporting by state threshold, claims current no detectable system PFAS and all quarterly results posted on dedicated webpage. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Qualifies reporting by state threshold, claims current no detectable system PFAS and all quarterly results posted on dedicated webpage. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-newport-beach-f4

Finding F4

Audit: Addressed

Response says

OCWD capital program and over $600 million investment assertion, no named financial record.

Audit analysis

OCWD capital program and over $600 million investment assertion, no named financial record. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

9/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

5/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
1/2

OCWD capital program and over $600 million investment assertion, no named financial record. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-newport-beach-f6

Finding F6

Audit: Addressed

Response says

Bare agreement.

Audit analysis

Bare agreement. Physical report PDF page 36; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

4/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

0/6

Public usefulness

Coverage
0/2
Reason specificity
0/2
Support traceability
0/2

Bare agreement. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-newport-beach-f8

Finding F8

Audit: Addressed

Response says

Disputes limited availability based on own comprehensive FAQs/testing webpage and OCWD fact sheet/updates; countywide 55% not independently rebutted, scope principally own outreach.

Audit analysis

Disputes limited availability based on own comprehensive FAQs/testing webpage and OCWD fact sheet/updates; countywide 55% not independently rebutted, scope principally own outreach. Physical report PDF page 36; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Disputes limited availability based on own comprehensive FAQs/testing webpage and OCWD fact sheet/updates; countywide 55% not independently rebutted, scope principally own outreach. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

recommendation · city-of-newport-beach-r2

Recommendation R2

County: ImplementedAudit: Addressed

Response says

City/OCWD monitoring, online testing results and non-detect distribution water; OCWD pilot/cost-share policy described.

Audit analysis

City/OCWD monitoring, online testing results and non-detect distribution water; OCWD pilot/cost-share policy described. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF pages 3–4. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: Continue monitoring/testing and posting all PFAS testing data online; no distribution-system detections claimed. Source status: claimed-ongoing; not independently verified.

Responsible party
City of Newport Beach
Timing
No timeframe stated

recommendation · city-of-newport-beach-r4

Recommendation R4

County: ImplementedAudit: Addressed

Response says

CCR portion will be implemented within required timeline; preserves split status.

Audit analysis

CCR portion will be implemented within required timeline; preserves split status. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 4. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent describes: Website portion complete; CCR portion to be implemented within required timeline. Source status: partially-implemented; not independently verified.

Responsible party
City of Newport Beach
Timing
2029-07-01 · Exact date

recommendation · city-of-newport-beach-r5

Recommendation R5

County: ImplementedAudit: Addressed

Response says

Continue educational website information and OCWD links.

Audit analysis

Continue educational website information and OCWD links. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 4. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: Continue website PFAS education and OCWD links. Source status: claimed-ongoing; not independently verified.

Responsible party
City of Newport Beach
Timing
No timeframe stated

finding · el-toro-water-district-f2

Finding F2

Audit: Addressed

Response says

Discusses county groundwater mitigation and reporting detected UCMR results.

Audit analysis

Discusses county groundwater mitigation and reporting detected UCMR results. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Discusses county groundwater mitigation and reporting detected UCMR results. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · el-toro-water-district-f6

Finding F6

Audit: Addressed

Response says

Own imported surface water treated at Diemer/Baker, distribution sampling and maintenance; no specific monitoring record.

Audit analysis

Own imported surface water treated at Diemer/Baker, distribution sampling and maintenance; no specific monitoring record. Physical report PDF page 36; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

9/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

5/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
1/2

Own imported surface water treated at Diemer/Baker, distribution sampling and maintenance; no specific monitoring record. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · el-toro-water-district-f8

Finding F8

Audit: Addressed

Response says

Explains exposure-dependent outreach, existing UCMR CCR reporting, PFAS page in preparation and Summer 2026 newsletter article.

Audit analysis

Explains exposure-dependent outreach, existing UCMR CCR reporting, PFAS page in preparation and Summer 2026 newsletter article. Physical report PDF page 36; selected response PDF pages 2–3. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Explains exposure-dependent outreach, existing UCMR CCR reporting, PFAS page in preparation and Summer 2026 newsletter article. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

recommendation · el-toro-water-district-r4

Recommendation R4

County: Will be implementedAudit: Addressed

Response says

PFAS page added to redesigned website not launched yet, launch shortly; will consider CCR advisory, not firm universal inclusion commitment.

Audit analysis

PFAS page added to redesigned website not launched yet, launch shortly; will consider CCR advisory, not firm universal inclusion commitment. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent describes: PFAS page already added to redesigned website; launch shortly; consider CCR advisory. Conditions/limits: Website not yet launched; no firm calendar date; CCR advisory only under consideration. Source status: partially-implemented; not independently verified.

Responsible party
El Toro Water District
Timing
No timeframe stated

recommendation · el-toro-water-district-r5

Recommendation R5

County: Will be implementedAudit: Addressed

Response says

Continue evaluating coordination opportunities; no specific date/action promised beyond evaluation.

Audit analysis

Continue evaluating coordination opportunities; no specific date/action promised beyond evaluation. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

finding · east-orange-county-water-district-f2

Finding F2

Audit: Addressed

Response says

Bare agreement.

Audit analysis

Bare agreement. Physical report PDF page 36; selected response PDF page 1. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

4/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

0/6

Public usefulness

Coverage
0/2
Reason specificity
0/2
Support traceability
0/2

Bare agreement. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · east-orange-county-water-district-f4

Finding F4

Audit: Addressed

Response says

Bare agreement.

Audit analysis

Bare agreement. Physical report PDF page 36; selected response PDF page 1. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

4/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

0/6

Public usefulness

Coverage
0/2
Reason specificity
0/2
Support traceability
0/2

Bare agreement. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · east-orange-county-water-district-f6

Finding F6

Audit: Addressed

Response says

Bare agreement.

Audit analysis

Bare agreement. Physical report PDF page 36; selected response PDF page 1. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

4/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

0/6

Public usefulness

Coverage
0/2
Reason specificity
0/2
Support traceability
0/2

Bare agreement. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · east-orange-county-water-district-f8

Finding F8

Audit: Partially addressed

Response says

Own website and OCWD fact sheet/quarterly updates identified; no express countywide agreement/disagreement.

Audit analysis

Own website and OCWD fact sheet/quarterly updates identified; no express countywide agreement/disagreement. Physical report PDF page 36; selected response PDF page 1. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

9/10

3/4

Statutory elements

Stated position
1/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Own website and OCWD fact sheet/quarterly updates identified; no express countywide agreement/disagreement. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

recommendation · east-orange-county-water-district-r2

Recommendation R2

County: UnclearAudit: Addressed

Response says

Cites decade monitoring, UCMR3/5 and DDW orders; local treatment timing not specified.

Audit analysis

Cites decade monitoring, UCMR3/5 and DDW orders; local treatment timing not specified. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: Continue stated OCWD-linked PFAS monitoring program, including cited UCMR3/5 and DDW orders; OCWD policy funds 100% design/construction and 50% eligible O&M where described. No universal local treatment-completion date inferred. Source status: claimed-ongoing; not independently verified.

Responsible party
East Orange County Water District
Timing
No timeframe stated

recommendation · east-orange-county-water-district-r4

Recommendation R4

County: UnclearAudit: Partially addressed

Response says

Bare agreement without implementation disposition.

Audit analysis

Bare agreement without implementation disposition. Explicit assent/general principle alone does not supply an implementation disposition or sufficient action detail. Physical report PDF page 37; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

recommendation · east-orange-county-water-district-r5

Recommendation R5

County: UnclearAudit: Addressed

Response says

Own/OCWD websites and OCWD monthly newsletter updates continuing.

Audit analysis

Own/OCWD websites and OCWD monthly newsletter updates continuing. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: Continue educational information on own/OCWD websites and OCWD newsletter. Source status: claimed-ongoing; not independently verified.

Responsible party
East Orange County Water District
Timing
No timeframe stated

finding · city-of-fullerton-f2

Finding F2

Audit: Addressed

Response says

Agrees to report PFAS in CCR, no current record or contamination explanation.

Audit analysis

Agrees to report PFAS in CCR, no current record or contamination explanation. Physical report PDF page 36; selected response PDF page 1. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

6/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

2/6

Public usefulness

Coverage
1/2
Reason specificity
1/2
Support traceability
0/2

Agrees to report PFAS in CCR, no current record or contamination explanation. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-fullerton-f4

Finding F4

Audit: Addressed

Response says

Bare agreement.

Audit analysis

Bare agreement. Physical report PDF page 36; selected response PDF page 1. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

4/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

0/6

Public usefulness

Coverage
0/2
Reason specificity
0/2
Support traceability
0/2

Bare agreement. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-fullerton-f6

Finding F6

Audit: Addressed

Response says

Bare agreement.

Audit analysis

Bare agreement. Physical report PDF page 36; selected response PDF page 1. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

4/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

0/6

Public usefulness

Coverage
0/2
Reason specificity
0/2
Support traceability
0/2

Bare agreement. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · city-of-fullerton-f8

Finding F8

Audit: Addressed

Response says

Conclusion supplies explicit F8 agreement; earlier response identifies 2026 CCR advisories, not 2025, and OCWD agency-specific sheets.

Audit analysis

Conclusion supplies explicit F8 agreement; earlier response identifies 2026 CCR advisories, not 2025, and OCWD agency-specific sheets. Physical report PDF page 36; selected response PDF pages 1–2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Conclusion supplies explicit F8 agreement; earlier response identifies 2026 CCR advisories, not 2025, and OCWD agency-specific sheets. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

recommendation · city-of-fullerton-r2

Recommendation R2

County: UnclearAudit: Partially addressed

Response says

Bare agreement, no implementation status or action summary.

Audit analysis

Bare agreement, no implementation status or action summary. Explicit assent/general principle alone does not supply an implementation disposition or sufficient action detail. Physical report PDF page 37; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

recommendation · city-of-fullerton-r4

Recommendation R4

County: UnclearAudit: Partially addressed

Response says

Bare agreement, no implementation status or action summary.

Audit analysis

Bare agreement, no implementation status or action summary. Explicit assent/general principle alone does not supply an implementation disposition or sufficient action detail. Physical report PDF page 37; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

recommendation · city-of-fullerton-r5

Recommendation R5

County: Will be implementedAudit: Addressed

Response says

Continue OCWD coordination; conclusion adopts September 30, 2026 deadline; ongoing OCWD website/newsletter distribution.

Audit analysis

Continue OCWD coordination; conclusion adopts September 30, 2026 deadline; ongoing OCWD website/newsletter distribution. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 2. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent describes: Continue OCWD coordination and implement R5 by specified report deadline. Source status: future; not independently verified.

Responsible party
City of Fullerton
Timing
2026-09-30 · Exact date

finding · irvine-ranch-water-district-f2

Finding F2

Audit: Addressed

Response says

Identifies existing CCR results, federal detection-conditional reporting after April 26, 2027, and county groundwater detections.

Audit analysis

Identifies existing CCR results, federal detection-conditional reporting after April 26, 2027, and county groundwater detections. Physical report PDF page 36; selected response PDF pages 1–2. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Identifies existing CCR results, federal detection-conditional reporting after April 26, 2027, and county groundwater detections. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · irvine-ranch-water-district-f4

Finding F4

Audit: Addressed

Response says

Enumerates OCWD cost-share policy, testing, monitoring recharge/basin, pilot studies, regulator work and laboratory certification.

Audit analysis

Enumerates OCWD cost-share policy, testing, monitoring recharge/basin, pilot studies, regulator work and laboratory certification. Physical report PDF page 36; selected response PDF pages 2–3. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Enumerates OCWD cost-share policy, testing, monitoring recharge/basin, pilot studies, regulator work and laboratory certification. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · irvine-ranch-water-district-f6

Finding F6

Audit: Addressed

Response says

Own drinking-water safety/compliance assertion supported by tens of thousands of annual tests and continuous monitoring, no particular dataset.

Audit analysis

Own drinking-water safety/compliance assertion supported by tens of thousands of annual tests and continuous monitoring, no particular dataset. Physical report PDF page 36; selected response PDF page 3. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

9/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

5/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
1/2

Own drinking-water safety/compliance assertion supported by tens of thousands of annual tests and continuous monitoring, no particular dataset. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

finding · irvine-ranch-water-district-f8

Finding F8

Audit: Addressed

Response says

Own PFAS Primer, tours/workshops and independent outreach; accepts 55% statistic, admits no advisory in 2025 or 2026 CCR. Source-entry low detections distinguished from no detectable PFAS delivered to customers.

Audit analysis

Own PFAS Primer, tours/workshops and independent outreach; accepts 55% statistic, admits no advisory in 2025 or 2026 CCR. Source-entry low detections distinguished from no detectable PFAS delivered to customers. Physical report PDF page 36; selected response PDF pages 3–4. Engagement is not independent factual, legal or implementation verification.

Finding-response score

Document completeness and usefulness—not factual verification or a legal conclusion.

10/10

4/4

Statutory elements

Stated position
2/2
Applicable disagreement elements
2/2

6/6

Public usefulness

Coverage
2/2
Reason specificity
2/2
Support traceability
2/2

Own PFAS Primer, tours/workshops and independent outreach; accepts 55% statistic, admits no advisory in 2025 or 2026 CCR. Source-entry low detections distinguished from no detectable PFAS delivered to customers. Scores distinguish explicit versus implied position, mapped reasons, material scope, specificity, and identified checkable basis; claims not independently verified.

Scoring confidence: high

recommendation · irvine-ranch-water-district-r2

Recommendation R2

County: ImplementedAudit: Addressed

Response says

All-source monitoring; 2018 positive well shutdown until treatment and return to service; alternatives include pausing sources, blending or treatment.

Audit analysis

All-source monitoring; 2018 positive well shutdown until treatment and return to service; alternatives include pausing sources, blending or treatment. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF pages 4–5. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: All-source PFAS monitoring; 2018 positive well shut down until treatment and returned to service. Conditions/limits: Approach may pause sources, blend or treat; no detect in delivered water does not mean all source samples non-detect. Source status: claimed-completed; not independently verified.

Responsible party
Irvine Ranch Water District
Timing
No timeframe stated

recommendation · irvine-ranch-water-district-r4

Recommendation R4

County: Will not be implementedAudit: Addressed

Response says

Rejects unconditional consistent advisory, but commits by July 1, 2029 to appropriate detection-triggered advisory/compliance information CCR/website; source results and facilities status already online.

Audit analysis

Rejects unconditional consistent advisory, but commits by July 1, 2029 to appropriate detection-triggered advisory/compliance information CCR/website; source results and facilities status already online. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF page 5. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Conditional offer: Continue disclosure of source results and facilities status; CCR/website advisory if federally defined detection requires it. Conditions/limits: Rejects recommendation for consistent advisory irrespective of detection; preserves partial/conditional commitment. Source status: conditional-future-with-refusal; not independently verified.

Responsible party
Irvine Ranch Water District
Timing
2029-07-01 · Conditional timing

recommendation · irvine-ranch-water-district-r5

Recommendation R5

County: Will not be implementedAudit: Addressed

Response says

Declines expansion given existing outreach; claims over four million 2025 and almost three million 2026 touchpoints, workshops/tours/web/social media/reports; continued retailer coordination as appropriate.

Audit analysis

Declines expansion given existing outreach; claims over four million 2025 and almost three million 2026 touchpoints, workshops/tours/web/social media/reports; continued retailer coordination as appropriate. Engages recommendation with actions, conditions, timing or explained refusal; engagement is not implementation verification or legal ruling. Physical report PDF page 37; selected response PDF pages 5–6. Engagement is not independent factual, legal or implementation verification.

Extracted commitments

Respondent reports: Continue social media/workshops/tours/web/quality reports and coordination as appropriate rather than expand outreach. Conditions/limits: Expansion explicitly refused as unwarranted; claimed 4 million 2025/almost 3 million 2026 touchpoints not independently verified. Source status: claimed-ongoing-with-refusal; not independently verified.

Responsible party
Irvine Ranch Water District
Timing
No timeframe stated